SrNo | WORK ORDER NO | CIRCLE | WORK NAME | ESTIMATE COST & DATE | TENDER AMOUNT & DATE | AGREEMENT DATE & ACTUAL WORK START DATE | Target date of Work Completion | Agreement date & ACTUAL work start DATE1 | CONTRACTOR NAME & PHONE NO. | ENG. NAME AND PHONE NO | circle1 | Physical Progress |
1
| 699/VP/N/2016-17 | Circle 1 | Sewer Connection of Lalpur Phase-I & Phase-II, Varanasi | 0.00 | 1.38 07/10/2016 | 15/11/2016 24/10/2016 | 09/11/2016 | 15/11/2016 24/10/2016 | Sanjiv Ranjan Srivastav 9336070099 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
2
| 38/VP/N/2018-19 | Circle 1 | Construction of road and interlocking tiles at Rajrajeshwari Nagar Colony Shivpur, Varanasi | 0.00 | 47.05 06/02/2018 | 10/04/2018 16/04/2018 | 15/07/2018 | 10/04/2018 16/04/2018 | Akhilesh Associats 9628373523 | CHANDRA SHEKHAR PRASAD 7518102826 JE DINESH SINGH 7518102809 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
3
| 732/VP/N/2016-17 | Circle 1 | Providing and laying BM & SDC work in internal road Lalpur-i Sector -C and D | 0.00 | 37.65 27/09/2016 | 19/11/2016 04/11/2016 | 03/01/2017 | 19/11/2016 04/11/2016 | Siddharth Construction 9415675937 | SURESH KUMAR 7905982953 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
4
| 310/VP/N/2018-19 | Circle 1 | Repairing of park & Construction of pathway in block-B Ashok Nagar colony, varanasi | 0.00 | 9.21 19/06/2018 | 25/07/2018 04/07/2018 | 05/12/2018 | 25/07/2018 04/07/2018 | Chandraprabha Enterprises 9838715352 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
5
| 307/VP/N/2018-19 | Circle 1 | Construction of CC Road from Akhari Vrindaban Sushwahi to plat no. 1398 in Varanasi | 0.00 | 3.43 19/06/2018 | 17/07/2018 04/07/2018 | 03/08/2018 | 17/07/2018 04/07/2018 | Siddharth Construction 9415675937 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
6
| 892/VP/N/2017-18 | Circle 1 | P/F of delineators & laying hot applied thermoplastice compound at maidagin crossing to godoliya part-B | 0.00 | 11.04 15/02/2018 | 19/03/2018 05/03/2018 | 04/04/2018 | 19/03/2018 05/03/2018 | J.P. Enterprises 6306131877 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
7
| 485/VP/N/2018-19 | Circle 1 | Beautification of park at lalpur phase-1 | 0.00 | 22.26 06/08/2018 | 23/08/2018 21/08/2018 | 20/11/2018 | 23/08/2018 21/08/2018 | Sanjiv Ranjan Srivastav 9336070099 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
8
| 370/VP/N/2018-19 | Circle 1 | Widening of road along sampurnand university from chaukaghat to teliyabagh. | 0.00 | 28.13 05/07/2018 | 25/07/2018 25/07/2018 | 21/09/2018 | 25/07/2018 25/07/2018 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
9
| 89/VP/N/2018-19 | Circle 1 | Repairing of road from main road to St. Jones school madauli, Bhoolanpur, Varanasi | 0.00 | 22.40 27/03/2018 | 19/04/2018 25/04/2018 | 24/05/2018 | 19/04/2018 25/04/2018 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
10
| 87/VP/N/2018-19 | Circle 1 | Construction of CC Road from Jaunpur marg NH-56 to Sindhaura link road, Varanasi | 0.00 | 482.17 06/02/2018 | 15/05/2018 25/04/2018 | 24/10/2018 | 15/05/2018 25/04/2018 | Vikesh and Associates 9795200444 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR DUBEY 7518102825 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
11
| 887/VP/N/2018-19 | Circle 1 | Construction of road from Araji no-635 koirajpur to NH-56 Jaunpur marg. | 0.00 | 37.16 22/11/2018 | 04/12/2018 30/11/2018 | 29/12/2018 | 04/12/2018 30/11/2018 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
12
| 826/VP/N/2018-19 | Circle 1 | P/L of chauka stone around main approach at village patanawa ramnagar ward varanasi. | 0.00 | 35.35 23/01/2018 | 15/02/2018 12/02/2018 | 11/05/2018 | 15/02/2018 12/02/2018 | Jay Bajarang Enterprises 9838506928 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
13
| 770/VP/N/2018-19 | Circle 1 | Installation of Pt. Deen Dayal Upadhyay ji statue and memorial development in padao chowk Ramnagar. | 0.00 | 2567.77 10/10/2018 | 17/11/2018 01/11/2018 | 30/04/2019 | 17/11/2018 01/11/2018 | CHINMAY CONSTRUCTION 9236627810 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
14
| 504/VP/N/2018-19 | Circle 1 | Repairing and painting of divider and fixing delineatore & applying thrmoplastic paint on road from pandeypur, varanasi. | 0.00 | 19.30 19/06/2018 | 14/09/2018 30/08/2018 | 29/10/2018 | 14/09/2018 30/08/2018 | Siddharth Construction 9415675937 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Not Started |
15
| 578/VP/N/2018-19 | Circle 1 | Development work of cattle colony at maheshpur katehr (cholapur) Varanasi. | 0.00 | 25.58 21/08/2018 | 11/10/2018 | 13/11/2018 | 11/10/2018 | Akhilesh Associats 9628373523 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Not Started |
16
| 880/VP/N/2017-18 | Circle 1 | Repairing & BMSDC work in Entrance main road and internal road of sector-c at lalpur Sindhaura road. Part-B | 0.00 | 18.70 23/01/2018 | 08/03/2018 26/02/2018 | 25/04/2018 | 08/03/2018 26/02/2018 | Akhilesh Associats 9628373523 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
17
| 824/VP/N/2017-18 | Circle 1 | P/L of rubber moulded interlocking tiles from house no. s 9/183 to s 9/183 B Nai basti sikraul ward | 0.00 | 6.62 23/01/2018 | 19/02/2018 12/02/2018 | 11/03/2018 | 19/02/2018 12/02/2018 | Akhilesh Associats 9628373523 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
18
| 718/VP/N/2016-17 | Circle 1 | P/L of BMSDC work from Maidagin machhodari road to katuapura and dalahatta road. | 0.00 | 19.75 27/09/2016 | 07/12/2016 02/11/2016 | 01/12/2016 | 07/12/2016 02/11/2016 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
19
| 422/VP/N/2016-17 | Circle 1 | P/L of BMSDC work ffrom gayghat PAC camp to adity general store mtitunjay mahadev mandir to bhairavnath mandir, shyam vihar sweet house to india street navapur at adampur polic chauki to koyala bazar varanasi. | 0.00 | 26.42 29/06/2016 | 09/08/2016 09/08/2016 | 08/09/2016 | 09/08/2016 09/08/2016 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
20
| 915/VP/N/2017-18 | Circle 1 | Construction of cc road from G.T road meghana hospital to marauli nala ( south side of meghana hospital) | 0.00 | 27.70 23/01/2018 | 08/03/2018 26/02/2018 | 25/05/2018 | 08/03/2018 26/02/2018 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Not Started |
21
| 486/VP/N/2018-19 | Circle 1 | Supply and fixing of tree guard in varanasi | 0.00 | 34.94 27/07/2018 | 18/09/2018 23/08/2018 | 22/10/2018 | 18/09/2018 23/08/2018 | J.P. Enterprises 6306131877 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
22
| 306/VP/N/2018-19 | Circle 1 | Construction of meeting hall on new building VDA office | 0.00 | 24.16 19/06/2018 | 17/07/2018 04/07/2018 | 03/01/2019 | 17/07/2018 04/07/2018 | Siddharth Construction 9415675937 | AMAR NATH YADAV 7518102835 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
23
| 95/VP/N/2018-19 | Circle 1 | Repairing and laying of slab on man hole chamber at lalpur yozana phase-1,2 | 0.00 | 3.15 27/03/2018 | 24/04/2018 27/04/2018 | 26/07/2018 | 24/04/2018 27/04/2018 | Saksham Enterprises 9415373169 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
24
| 438/VP/N/2018-19 | Circle 1 | Careness and planting etc work according to compliance of target 11500 plants in varanasi city | 0.00 | 11.87 18/07/2018 | 08/08/2018 04/08/2018 | 03/10/2018 | 08/08/2018 04/08/2018 | Dinesh singh 9415799588 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
25
| 309/VP/N/2018-19 | Circle 1 | Repairing of boundary wall sampurnand university from chaukaghat to teliyabag. | 0.00 | 4.30 19/06/2018 | 17/07/2018 04/07/2018 | 03/09/2018 | 17/07/2018 04/07/2018 | Saksham Enterprises 9415373169 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
26
| 723/VP/N/2016-17 | Circle 1 | Repairing /beautification of rambatt talab at shivpur, varanasi. | 0.00 | 54.47 04/10/2016 | 27/11/2016 02/11/2016 | 01/02/2017 | 27/11/2016 02/11/2016 | Bhootnath Associats 9839110971 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
27
| 07/VP/N/2017-18 | Circle 1 | CONSTRUCTION OF 3 FIVE SEATER COMMUNITY TOILET COMPLEX & SEPTIC, TANK ON FORTH PARAV SHIVPUR ON PANCHKOSHI MARG VARANASI. | 0.00 | 54.07 28/11/2016 | 24/04/2017 06/04/2017 | 05/09/2017 | 24/04/2017 06/04/2017 | Sanjiv Ranjan Srivastav 9336070099 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR DUBEY 7518102825 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
28
| 349/VP/N/2018-19 | Circle 1 | cONSTRUCTION OF MURALS ON OUTER SIDE BOUNDARY WALL OF COMMISSIONERY OFFICE VARANASI. | 0.00 | 6.92 07/07/2018 | 17/07/2018 15/07/2018 | 30/07/2018 | 17/07/2018 15/07/2018 | Om sai Construction 9453785608 | ANIL SINGHAL 7518102841 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
29
| 705/VP/N/2018-19 | Circle 1 | Remaining work of chauka stone from parmanand house to Dara yadav house at Rambagar Varanasi. | 0.00 | 6.25 14/09/2018 | 06/11/2018 15/10/2018 | 14/12/2018 | 06/11/2018 15/10/2018 | Vaisno Enterprises 8859794188 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
30
| 37/VP/N/2018-19 | Circle 1 | Construction of boundrywall at VDA compound near water tank jal nigam Varanasi. | 0.00 | 2.39 27/03/2018 | 25/04/2018 16/04/2018 | 15/06/2018 | 25/04/2018 16/04/2018 | Bhairav Construction 7007293122 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
31
| 36/VP/N/2018-19 | Circle 1 | Construction of park at mahamanapuri colony karaudi, Varanasi. | 0.00 | 18.78 27/03/2018 | 10/04/2018 16/04/2018 | 15/07/2018 | 10/04/2018 16/04/2018 | Sainik Construction Company 9918001245 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
32
| 829/VP/N/2017-18 | Circle 1 | Construction of park near Transformer at lalpur phase-2 | 0.00 | 4.30 23/01/2018 | 15/02/2018 12/02/2018 | 11/04/2018 | 15/02/2018 12/02/2018 | Bhairav Construction 7007293122 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
33
| 893/VP/N/2017-18 | Circle 1 | Providing & Fixing delineators & laying hot applied thermoplastic compound at maidagin crossing to godoliya Part-A | 0.00 | 24.97 14/02/2018 | 19/03/2018 05/03/2018 | 04/04/2018 | 19/03/2018 05/03/2018 | Navoday Signage Works 9451035361 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
34
| 879/VP/N/2017-18 | Circle 1 | CONSTRUCTION OF ROAD AT GANESH DHAM COLONY NEWADA/KARMAJEETPUR FROM SACHIDANAND SHARMA HOUSE TO DIHA BABA ROAD NAGAWA WARD | 0.00 | 15.71 23/01/2018 | 08/03/2018 26/02/2018 | 25/04/2018 | 08/03/2018 26/02/2018 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
35
| 772A/VP/N/2017-18 | Circle 1 | Construction of 9.0 m wide road in Lalpur Schme Lalpur -1 | 0.00 | 10.29 16/01/2018 | 25/01/2018 01/02/2018 | 15/02/2018 | 25/01/2018 01/02/2018 | Akhilesh Associats 9628373523 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
36
| 926/VP/N/2016-17 | Circle 1 | supply of RCC sewer chaimber cover at lalpur housing scheme. | 0.00 | 4.48 24/12/2016 | 03/01/2017 31/12/2016 | 30/01/2017 | 03/01/2017 31/12/2016 | Sita Traders 9838964640 | SURESH KUMAR 7905982953 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
37
| 823/VP/N/2017-18 | Circle 1 | P/L of rubber moulded interlocking from lahurabir chauraha to gayatri mandir marg. | 0.00 | 11.51 23/01/2018 | 08/03/2018 07/02/2018 | 11/04/2018 | 08/03/2018 07/02/2018 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
38
| 888/VP/N/2017-18 | Circle 1 | Construction of road in maneesh apportment (motijeel) infront of maheshwari bhawan mahamoorganj varanasi. | 0.00 | 9.07 23/01/2018 | 08/03/2018 26/02/2018 | 25/03/2018 | 08/03/2018 26/02/2018 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
39
| 700/VP/N/2016-17 | Circle 1 | Cleaning of Sumpwell & semiditation tank and repairing work of STP Lalpur Varanasi. | 0.00 | 21.04 04/10/2016 | 04/11/2016 21/10/2016 | 23/11/2016 | 04/11/2016 21/10/2016 | Singh Enterprises 9451893249 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
40
| 711/VP/N/2016-17 | Circle 1 | P/L of interlocking and drain work infront of landmark Tower-1&2 | 0.00 | 38.31 04/10/2016 | 02/11/2016 26/10/2016 | 25/12/2016 | 02/11/2016 26/10/2016 | Purvanchal Construction 9161884000 | CHANDRA SHEKHAR PRASAD 7518102826 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
41
| 479/VP/N/2014-15 | Circle 1 | Construction of CC Road from st. steefen school to Interlocking road via Nia basti bangali tola at Ramnagar Varanasi. | 0.00 | 23.71 14/11/2014 | 05/12/2014 03/12/2014 | 02/01/2015 | 05/12/2014 03/12/2014 | Bhootnath Associats 9839110971 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
42
| 359/VP/N/2010-11 | Circle 1 | S/F of stone chauka& sewer work in wark No-4 from house no A36/26 part to A 36/26 BJ Varanasi. | 0.00 | 2.54 28/07/2010 | 03/08/2010 05/08/2010 | 04/09/2010 | 03/08/2010 05/08/2010 | J.K. and Company 9450361371 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
43
| 714/VP/N/2016-17 | Circle 1 | Construction of approach road from sector-D to Bara lalpur village at lalpur Phase-1 | 0.00 | 9.43 27/09/2016 | 24/11/2016 26/10/2016 | 25/11/2016 | 24/11/2016 26/10/2016 | Kumar and Company 9415301893 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
44
| 941D/VP/N/2018-19 | Circle 1 | Painting of divider from DLW bridge to kabeer parktya dham lahartara varanasi. | 0.00 | 1.75 09/03/2018 | 29/03/2018 09/03/2018 | 11/03/2018 | 29/03/2018 09/03/2018 | Alok Construction 9936592504 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
45
| 733/VP/N/2016-17 | Circle 1 | P/L of BM and SDC work from Ausanganj Chauraha to Adampur police chauki | 0.00 | 23.46 27/09/2016 | 24/11/2016 04/11/2016 | 03/01/2017 | 24/11/2016 04/11/2016 | Sainik Construction Company 9918001245 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
46
| 949/VP/N/2015-16 | Circle 1 | Providing H.T. Line for land mark Tower phase-2 at lalpur phase-1 varanasi. | 0.00 | 2.54 20/02/2016 | 02/03/2016 04/03/2016 | 03/04/2016 | 02/03/2016 04/03/2016 | Shakti Traders 9839653307 | SURESH KUMAR 7905982953 JE M.N. ANSHARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
47
| 435B/VP/N/2017-18 | Circle 1 | Enamel painting work on cental verge from beniyabag to Godauliya Girjaghar (part-C) | 0.00 | 0.69 15/09/2017 | 12/09/2017 16/09/2017 | 22/09/2017 | 12/09/2017 16/09/2017 | Singh Enterprises 9451893249 | ANIL SINGHAL 7518102841 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
48
| 701/VP/N/2016-17 | Circle 1 | Providing lighting repairing arrangement at sant Ravidas park Nagwa varanasi. | 0.00 | 1.63 07/10/2016 | 18/11/2016 24/10/2016 | 10/11/2016 | 18/11/2016 24/10/2016 | P.K. Construction Company 9452564777 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
49
| 836B/VP/N/2015-16 | Circle 1 | Providing&Laying patch repairing work and BMSDBC on old surface at hukulganj to pandeypur varanasi (Part-B) | 0.00 | 49.35 27/11/2015 | 30/12/2015 30/12/2015 | 30/01/2016 | 30/12/2015 30/12/2015 | Sainik Construction Company 9918001245 | SURESH KUMAR 7905982953 JE M.N. ANSHARI 7518102819 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
50
| 26/VP/N/2016-17 | Circle 1 | Construction of pathway at saket nagar colony park no-2 Varanasi. | 0.00 | 13.95 30/12/2015 | 12/05/2016 12/05/2016 | 11/06/2016 | 12/05/2016 12/05/2016 | Dev Enterprises 6454000083 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
51
| 926/VP/N/2017-18 | Circle 1 | P/F Interlocking tiles at 24 mt. road to 12 mt. road lalpur awas yajana phase-1 Varanasi Part-D | 0.00 | 5.18 14/02/2018 | 16/03/2018 12/03/2018 | 11/05/2018 | 16/03/2018 12/03/2018 | P.K. Construction Company 9452564777 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
52
| 941E/VP/N/2018-19 | Circle 1 | Painting on divider from DLW bridge to bhikharipur Tiraha&Nariya marg to Kaushesh nagar Varanasi. | 0.00 | 1.51 09/03/2018 | 09/03/2018 09/03/2018 | 11/03/2018 | 09/03/2018 09/03/2018 | Ajay Electronics 9454352628 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
53
| 255/VP/N/2018-19 | Circle 1 | Cleaning of road and covered of garbage with G.I Pipe on 24 mt. main road at baralalpur Scheme Phase-1 Varanasi. | 0.00 | 0.81 07/06/2018 | 18/06/2018 07/06/2018 | 09/06/2018 | 18/06/2018 07/06/2018 | Saksham Enterprises 9415373169 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
54
| 245/VP/N/2015-16 | Circle 1 | Improvement of road from maqbool Alam road to pandeypur(khajuri/sudhakar road) varanasi. | 0.00 | 48.91 10/04/2015 | 28/05/2015 26/05/2015 | 27/07/2015 | 28/05/2015 26/05/2015 | Kumar and Company 9415301893 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
55
| 422/VP/N/2014-15 | Circle 1 | Construction of U-type drain from PAC post office to munnalal sonkar house(on left side of proposed cc road) at Ramnagar Varanasi.(Part-A) | 0.00 | 39.91 14/11/2014 | 03/12/2014 03/12/2014 | 02/02/2015 | 03/12/2014 03/12/2014 | Dev Enterprises 6454000083 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
56
| 914/VP/N/2017-18 | Circle 1 | Construction of pathway on stone bolder patching slop at ramkund srinagar colony luxa varanasi. | 0.00 | 13.80 23/01/2018 | 19/03/2018 12/02/2018 | 11/04/2018 | 19/03/2018 12/02/2018 | Alok Construction 9936592504 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
57
| 877/VP/N/2018-19 | Circle 1 | Construction of road from Aaraji line 8,9, to jaunpur marg | 0.00 | 33.17 22/11/2018 | 04/12/2018 30/11/2018 | 29/12/2018 | 04/12/2018 30/11/2018 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
58
| 785/VP/N/2018-19 | Circle 1 | Repairing of furniture P U paint and making planter in commissioner comp office Varanasi. | 0.00 | 3.31 26/10/2018 | 02/11/2018 02/11/2018 | 01/12/2018 | 02/11/2018 02/11/2018 | Bhootnath Associats 9839110971 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
59
| 441/VP/N/2016-17 | Circle 1 | Paitch repairing & BM SDC work in front of L.I.G/E.W.S at lalpur Phase-1 | 0.00 | 33.44 29/06/2016 | 29/08/2016 29/08/2016 | 28/10/2016 | 29/08/2016 29/08/2016 | Jwalamukhi Construction 9648999945 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
60
| 887/VP/N/2017-18 | Circle 1 | P/L of BM SDC work at Gautam Grden Colony Shivpur, Varanasi | 0.00 | 20.65 23/01/2018 | 08/03/2018 26/02/2018 | 25/03/2018 | 08/03/2018 26/02/2018 | Jwalamukhi Construction 9648999945 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
61
| 693/VP/N/2016-17 | Circle 1 | S/F of CC Curve stone and bolard on Cycle trace from Ashapur to Subji mandi panch krashi road Part-B | 0.00 | 40.76 07/10/2016 | 07/11/2016 23/10/2016 | 22/11/2016 | 07/11/2016 23/10/2016 | Jwalamukhi Construction 9648999945 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
62
| 881/VP/N/2017-18 | Circle 1 | Repairing & BM SDC work in entrance main road and internal road of sector-C at lalpur Sindhaura road Part-A | 0.00 | 18.52 23/01/2018 | 08/03/2018 26/02/2018 | 25/03/2018 | 08/03/2018 26/02/2018 | Jwalamukhi Construction 9648999945 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
63
| 885/VP/N/2017-18 | Circle 1 | Repairing & BM SDC work (EWS&LIG) at lalpur Sindhaura road PART-B | 0.00 | 39.73 23/01/2018 | 08/03/2018 26/02/2018 | 25/04/2018 | 08/03/2018 26/02/2018 | Jwalamukhi Construction 9648999945 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
64
| 924/VP/N/2016-17 | Circle 1 | Construction of 4 Five seater community toilet complex & septic tank on third parav Rameshwar or panchkoshi marg Varanasi. | 0.00 | 72.09 23/12/2016 | 12/01/2017 30/12/2016 | 29/05/2017 | 12/01/2017 30/12/2016 | Purvanchal Construction 9161884000 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR DUBEY 7518102825 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
65
| 941B/VP/N/2018-19 | Circle 1 | Painting on divider from Vivekanand Park to T.V Towar varuna bridge Via kachahari all part and circuit houses Varanasi. | 0.00 | 2.82 09/03/2018 | 19/03/2018 09/03/2018 | 11/03/2018 | 19/03/2018 09/03/2018 | Bhootnath Associats 9839110971 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
66
| 440F/VP/N/2017-18 | Circle 1 | Enamel painting work from lahurabir Crossing to Beniyabag on central Verge (Part-A) | 0.00 | 0.87 15/09/2017 | 12/10/2017 16/09/2017 | 22/09/2017 | 12/10/2017 16/09/2017 | Singh Enterprises 9451893249 | ANIL SINGHAL 7518102841 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
67
| 866/VP/N/2015-16 | Circle 1 | Repairing maintenance of steet light at lalpur phase-1 and phase-2 Varanasi. | 0.00 | 2.07 30/12/2015 | 30/01/2016 31/01/2016 | 29/02/2016 | 30/01/2016 31/01/2016 | P.K. Construction Company 9452564777 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
68
| 321/VP/N/2018-19 | Circle 1 | Painting chitra on commissioner office boundary wall, circuit house, Udyan vibhag, Varanasi. | 0.00 | 21.05 06/07/2018 | 01/08/2018 06/07/2018 | 13/07/2018 | 01/08/2018 06/07/2018 | Om sai Construction 9453785608 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
69
| 820/VP/N/2017-18 | Circle 1 | Repairing of tringular park in front of EWS/LIG at lalpur phase-2 | 0.00 | 2.98 23/01/2018 | 16/02/2018 12/02/2018 | 11/03/2018 | 16/02/2018 12/02/2018 | Kumar and Company 9415301893 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
70
| 418/VP/N/2014-15 | Circle 1 | Widening of hukulaganj road chaukaght Tiraha to pandeypur chauraha(Part-B) Varanasi. | 0.00 | 59.98 14/11/2014 | 03/12/2014 03/12/2014 | 02/02/2015 | 03/12/2014 03/12/2014 | Sainik Construction Company 9918001245 | ANIL SINGHAL 7518102841 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
71
| 449/VP/N/2013-14 | Circle 1 | Construction of road divider from nariya Tiraha to BHU gate Varanasi. | 0.00 | 32.35 10/09/2013 | 07/10/2013 07/10/2013 | 06/11/2013 | 07/10/2013 07/10/2013 | Bhairav Construction 7007293122 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
72
| 708/VP/N/2016-17 | Circle 1 | Construction of pathway & grill in park at lalpur anhe Yozana Phase-1 | 0.00 | 4.07 20/10/2016 | 04/11/2016 24/10/2016 | 23/11/2016 | 04/11/2016 24/10/2016 | Singh Enterprises 9451893249 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
73
| 713/VP/N/2016-17 | Circle 1 | Repairing of road at officers colony khajuri sikaraul ward. | 0.00 | 15.49 27/09/2016 | 07/12/2016 26/10/2016 | 25/11/2016 | 07/12/2016 26/10/2016 | Kumar and Company 9415301893 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
74
| 434A/VP/N/2017-18 | Circle 1 | Enamel Painting work on central verge from beniyabag to Godauliya Girjaghar(Part-B) | 0.00 | 0.70 15/09/2017 | 12/10/2017 16/09/2017 | 22/09/2017 | 12/10/2017 16/09/2017 | Singh Enterprises 9451893249 | ANIL SINGHAL 7518102841 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
75
| 488/VP/N/2016-17 | Circle 1 | P/L of chauka from gayghat aditya general store to bhairawanath mandir chauraha varanasi. | 0.00 | 11.61 29/06/2016 | 29/08/2016 31/03/2017 | 28/10/2016 | 29/08/2016 31/03/2017 | Vaisno Enterprises 8859794188 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
76
| 1023/VP/N/2015-16 | Circle 1 | Supply&fixing of CCTV cemera at commissioner office parisar Varanasi. | 0.00 | 2.70 08/03/2016 | 02/04/2016 02/04/2016 | 17/04/2016 | 02/04/2016 02/04/2016 | V-Tech Electronics | SURESH KUMAR 7905982953 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
77
| 790/VP/N/2016-17 | Circle 1 | S/L of stone chauka from mukesh gupta house to kailash maurya house at ramnagar ward nayee basti Varanasi. | 0.00 | 2.86 04/10/2016 | 25/11/2016 17/11/2016 | 16/12/2016 | 25/11/2016 17/11/2016 | J.K. and Company 9450361371 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
78
| 496/VP/N/2016-17 | Circle 1 | Paitch repairing & BM SDC work in Sector-C at lalpur Phase-1 | 0.00 | 18.64 29/06/2016 | 03/09/2016 31/01/2017 | 02/11/2016 | 03/09/2016 31/01/2017 | Kumar and Company 9415301893 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
79
| 924/VP/N/2017-18 | Circle 1 | P/L Interlocking tiles at 24 mt road to 12 mtr road(eletric Sub station) Lalpur Awas Yojana, Phase-1 Varanasi Part-B | 0.00 | 4.40 15/02/2018 | 12/03/2018 12/03/2018 | 11/05/2018 | 12/03/2018 12/03/2018 | Sanjay singh sarin and company 9336902909 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
80
| 873/VP/N/2015-16 | Circle 1 | Relaying/reseting of old existing stone chauka at wark no-60 and 61 Varanasi(Part-B) | 0.00 | 9.11 30/12/2015 | 01/02/2016 01/02/2016 | 31/03/2016 | 01/02/2016 01/02/2016 | Chandra Construction 9839064005 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
81
| 461/VP/N/2016-17 | Circle 1 | Construction of boundary wall for LIG &EWS in Anhe at lalpur Phase-1 | 0.00 | 3.38 29/06/2016 | 11/08/2016 11/08/2016 | 10/10/2016 | 11/08/2016 11/08/2016 | Sandeep Kumar Pandey 9451580336 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
82
| 594/VP/N/2018-19 | Circle 1 | Cover from steel structure of open part of Dashaswamedh parking stand varanasi. | 0.00 | 9.09 08/09/2018 | 14/09/2018 | 14/10/2018 | 14/09/2018 | Sanjay singh sarin and company 9336902909 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
83
| 595/VP/N/2018-19 | Circle 1 | Painting work at commissioner camp office vikas bhavan, police chauki, mint house and andhrapool Varanasi. | 0.00 | 2.51 08/09/2018 | 20/09/2018 15/09/2018 | 30/09/2018 | 20/09/2018 15/09/2018 | Sanjiv Ranjan Srivastav 9336070099 | ANIL SINGHAL 7518102841 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
84
| 783/VP/N/2018-19 | Circle 1 | Supply and fixing of curtain, blinds and wall paper at commissioner camp office Varanasi. | 0.00 | 2.18 26/10/2018 | 13/11/2018 02/11/2018 | 01/12/2018 | 13/11/2018 02/11/2018 | Hardik And Company 8299382818 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
85
| 727/VP/N/2018-19 | Circle 1 | Providing & Fixing of fall ceiling wall paneling &repair of toilet at VC office room No-3&4 in VDA, Varanasi. | 0.00 | 7.07 04/10/2018 | 24/10/2018 24/10/2018 | 23/11/2018 | 24/10/2018 24/10/2018 | Hardik And Company 8299382818 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
86
| 886/VP/N/2017-18 | Circle 1 | Repairing & BM SDC work(EWS&LIG) at lalpur sindhora road Part-A | 0.00 | 11.26 23/01/2018 | 19/03/2018 26/02/2018 | 25/04/2018 | 19/03/2018 26/02/2018 | Gangasagar Singh 7705838383 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
87
| 465/VP/N/2017-18 | Circle 1 | Providing floor tiles and repairing work at Aukt/Adhyaksh, VDA camp office Varanasi. | 0.00 | 6.73 29/08/2017 | 26/09/2017 21/09/2017 | 20/10/2017 | 26/09/2017 21/09/2017 | Siddharth Construction 9415675937 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
88
| 817/VP/N/2017-18 | Circle 1 | P/L of 80mm thick interlocking from rajendra singh house to awadh ram house&praveen Rai house to satish singh house khushahal nagar sector-A Part-B | 0.00 | 10.97 23/01/2018 | 19/02/2018 12/02/2018 | 11/03/2018 | 19/02/2018 12/02/2018 | Akhilesh Associats 9628373523 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
89
| 927/VP/N/2017-18 | Circle 1 | Construction of C.C Road on Sindhora road near narenda Singh Building material shop to gyanwati house varanasi. | 0.00 | 31.59 23/01/2018 | 08/03/2018 12/03/2018 | 11/06/2018 | 08/03/2018 12/03/2018 | Akhilesh Enterprises 9415202926 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
90
| 821/VP/N/2017-18 | Circle 1 | P/L of interlocking work at bajarang vihar colony taktakpur Varanasi. Part-B | 0.00 | 10.27 23/01/2018 | 19/03/2018 12/02/2018 | 11/04/2018 | 19/03/2018 12/02/2018 | Akhilesh Associats 9628373523 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
91
| 346/VP/N/2018-19 | Circle 1 | Construction of toilet block at commissioner camp office Varanasi. | 0.00 | 3.63 07/07/2018 | 12/07/2018 18/07/2018 | 17/09/2018 | 12/07/2018 18/07/2018 | Siddharth Construction 9415675937 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
92
| 923/VP/N/2017-18 | Circle 1 | P/F interlocking tiles at 24 mtr road to 12 mtr road (electrict sub station) Lalpur Awas Yojana, Phase-1 Varanasi. | 0.00 | 1.10 14/02/2018 | 13/03/2018 12/03/2018 | 11/05/2018 | 13/03/2018 12/03/2018 | Vaisno Enterprises 8859794188 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
93
| 782/VP/N/2018-19 | Circle 1 | Providing and laying of tiles and changing of chaukhat, door, tiles in bathroom and G.I fitting at VC camp office, Varanasi. | 0.00 | 9.84 26/10/2018 | 06/11/2018 02/11/2018 | 01/12/2018 | 06/11/2018 02/11/2018 | Manoj kumar singh 9415284031 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
94
| 728/VP/N/2018-19 | Circle 1 | Supply and installation of 40 KVA silent jenset in commissioner office Varanasi. | 0.00 | 9.83 04/10/2018 | 27/10/2018 24/10/2018 | 23/11/2018 | 27/10/2018 24/10/2018 | Ajay Electronics 9454352628 | ATUL MISHRA 7518102839 JE M.N. ANSHARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
95
| 729/VP/N/2018-19 | Circle 1 | Supply and installation of 82.5 KVA silent jenset in VDA parisar, Varanasi | 0.00 | 9.98 04/10/2018 | 27/10/2018 24/10/2018 | 23/11/2018 | 27/10/2018 24/10/2018 | Ajay Electronics 9454352628 | ATUL MISHRA 7518102839 JE M.N. ANSHARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
96
| 992A/VP/N/2017-18 | Circle 1 | Maintenance work of Lalpur Housing Yojana Landmark Tower-2 (House keeping) Varanasi | 0.00 | 3.99 22/02/2018 | 29/03/2018 25/03/2018 | 24/09/2018 | 29/03/2018 25/03/2018 | Sanjiv Ranjan Srivastav 9336070099 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
97
| 941F/VP/N/2018-19 | Circle 1 | Painting of central varj from bhojubir tiraha to atulanand tiraha, cleaning of sewer around of stadium at lalpur panting O.H.T& sinage board at main gate at lalpur Varanasi. | 0.00 | 4.46 09/03/2018 | 19/03/2018 09/03/2018 | 11/03/2018 | 19/03/2018 09/03/2018 | Vaisno Enterprises 8859794188 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
98
| 770/VP/N/2016-17 | Circle 1 | Plastering, railing, interlocking and mess jail& other work at Sankat haran hanuman mandir parisar Benipur Varanasi. | 0.00 | 23.06 04/10/2016 | 28/11/2016 12/11/2016 | 11/01/2017 | 28/11/2016 12/11/2016 | Vinod kumar singh 9415226443 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
99
| 246/VP/N/2015-16 | Circle 1 | Strengthening of road from nadesar chauraha to Dainik jagaran road, Varanasi. | 0.00 | 27.46 10/04/2015 | 26/05/2015 26/05/2015 | 25/07/2015 | 26/05/2015 26/05/2015 | Kumar and Company 9415301893 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
100
| 941I/VP/N/2018-19 | Circle 1 | Painting of divider from bhikharipur Tiraha to Kaushlesh Nagar Colony, Varanasi | 0.00 | 2.36 09/03/2018 | 29/03/2018 09/03/2018 | 11/03/2018 | 29/03/2018 09/03/2018 | Manoj kumar singh 9415284031 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
101
| 249/VP/N/2015-16 | Circle 1 | Widening of road from karaudi chauraha to chitaipur chauraha, Varanasi. | 0.00 | 86.03 10/04/2015 | 24/06/2015 25/06/2015 | 24/08/2015 | 24/06/2015 25/06/2015 | Manoj kumar singh 9415284031 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
102
| 152/VP/N/2015-16 | Circle 1 | Providing & Laying of virified floor tiles in first floor Verandah in VDA office Building. | 0.00 | 4.05 16/04/2015 | 19/05/2015 19/05/2015 | 02/06/2015 | 19/05/2015 19/05/2015 | Siddharth Construction 9415675937 | SURESH KUMAR 7905982953 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
103
| 670/VP/N/2014-15 | Circle 1 | Providing and laying of interlocking in outside vehicle stand and internal gate for Nakshtra Vatica Varanasi | 0.00 | 4.90 21/02/2015 | 18/03/2015 19/03/2015 | 18/04/2015 | 18/03/2015 19/03/2015 | Manoj kumar singh 9415284031 | SURESH KUMAR 7905982953 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
104
| 875/VP/N/2016-17 | Circle 1 | Construction of guard room and porch and repairing of water line, electrification work at V.C camp office VDA Varanasi. | 0.00 | 8.00 22/11/2016 | 20/12/2016 14/12/2016 | 13/01/2017 | 20/12/2016 14/12/2016 | Manoj kumar singh 9415284031 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
105
| 169/VP/N/2016-17 | Circle 1 | Painting washing of FC and EE(G) office with renovation of attached toilet and repairing of D Park front porch of VDA office. | 0.00 | 2.15 31/05/2016 | 24/06/2016 24/06/2016 | 09/07/2016 | 24/06/2016 24/06/2016 | Siddharth Construction 9415675937 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
106
| 724/VP/N/2016-17 | Circle 1 | Repairing of park, construction of boundary wall and pathway park at officers colony Khajuri ward. | 0.00 | 11.57 04/10/2016 | 19/11/2016 02/11/2016 | 01/01/2017 | 19/11/2016 02/11/2016 | M.K. Enterprises 9415939650 | ANIL SINGHAL 7518102841 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
107
| 784/VP/N/2016-17 | Circle 1 | Formation of General public help in speed point room etc work at VDA Campus Varanasi. | 0.00 | 5.70 05/11/2016 | 18/11/2016 12/11/2016 | 03/12/2016 | 18/11/2016 12/11/2016 | Manoj kumar singh 9415284031 | SURESH KUMAR 7905982953 JE V.K GUPTA 7518102820 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
108
| 651/VP/N/2018-19 | Circle 1 | Maintenance of sewer, road, drain & malwa at Lalpur Yozana Phase-I & II | 0.00 | 4.01 20/09/2018 | 23/10/2018 01/10/2018 | 31/03/2019 | 23/10/2018 01/10/2018 | M/s Kiyana Solution and services Pvt. Ltd. | PARAS NATH 7518102827 JE ANIL KUMAR DUBEY 7518102825 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
109
| test1 | Circle 1 | B.M. and SDC Work at DIG Colony, Varanasi. | 0.00 | 9.95 26/03/2019 | 11/06/2019 05/06/2019 | 04/07/2019 | 11/06/2019 05/06/2019 | Akhilesh Associats 9628373523 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
110
| 1036/VP/N/2018-19 | Circle 1 | Laying sewer line Hasanpur village under DLW and Maduadih Railway Crossing, Varanasi. | 0.00 | 43.87 22/12/2018 | 20/02/2019 26/02/2019 | 25/05/2019 | 20/02/2019 26/02/2019 | M/s Ideal Trenchless Crossing 7355135610 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
111
| 787/VP/N/2018-19 | Circle 1 | Development work of BHU Varansi. | 0.00 | 133.31 19/10/2018 | 04/12/2018 06/11/2018 | 05/02/2019 | 04/12/2018 06/11/2018 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
112
| 704/VP/N/2018-19 | Circle 1 | Construction of Park, Boundary wall and land scaping work at Prashantpuri Colony Varanasi. | 0.00 | 42.61 14/09/2018 | 17/11/2018 15/10/2018 | 14/02/2019 | 17/11/2018 15/10/2018 | Pratap Enterprises 9161942660 | ATUL MISHRA 7518102839 JE ANIL KUMAR DUBEY 7518102825 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
113
| 1175/VP/N/2018-19 | Circle 1 | Widening of road on Rathyatra Chauraha, Varanasi. | 0.00 | 4.43 22/02/2019 | 05/03/2019 06/03/2019 | 21/03/2019 | 05/03/2019 06/03/2019 | Manoj kumar singh 9415284031 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
114
| 730/VP/N/2018-19 | Circle 1 | Construction of CC road and laying of Sewer line at Madhav Seva Prakalp, Bhadohi road KM-6 Varanasi. | 0.00 | 52.28 17/08/2018 | 26/10/2018 28/10/2018 | 27/01/2019 | 26/10/2018 28/10/2018 | Rudra Construction 9453066647 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
115
| 786/VP/N/2018-19 | Circle 1 | Construction of road and drain in proposal Cattle colony over SM Plot 157 village-Chhitampur Vns. | 0.00 | 115.05 11/10/2018 | 24/12/2018 06/11/2018 | 05/03/2019 | 24/12/2018 06/11/2018 | Hind Associates 9415227155 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
116
| 649/VP/N/2018-19 | Circle 1 | Suplly, fixing and repairing of overhead board on enty road at Varanasi. | 0.00 | 59.14 30/08/2018 | 01/10/2018 01/10/2018 | 31/12/2018 | 01/10/2018 01/10/2018 | Navoday Signage Works 9451035361 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
117
| 879/VP/N/2018-19 | Circle 1 | Laying Interlocking tiles surrounding stadium at Lalpur Scheme Varanasi. | 0.00 | 60.36 14/11/2018 | 04/12/2018 30/12/2018 | 18/01/2019 | 04/12/2018 30/12/2018 | Vaisno Enterprises 8859794188 | PARAS NATH 7518102827 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
118
| 440/VP/N/2018-19 | Circle 1 | Construction of New Jursy Type barriers in Varanasi. | 0.00 | 44.61 21/07/2018 | 10/08/2018 08/08/2018 | 07/11/2018 | 10/08/2018 08/08/2018 | Surya Associtas 9793187621 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
119
| 357/VP/N/2018-19 | Circle 1 | P/L of interlocking tiles as prashantpuri colony near DIG office. | 0.00 | 3.32 07/07/2018 | 12/07/2018 13/07/2018 | 12/08/2018 | 12/07/2018 13/07/2018 | Manoj kumar singh 9415284031 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
120
| 577/VP/N/2016-17 | Circle 1 | P/L of interlocking block from prahalad ghat to kashi station marg. | 0.00 | 22.71 29/06/2016 | 05/09/2016 05/09/2016 | 04/11/2016 | 05/09/2016 05/09/2016 | J.K. and Company 9450361371 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
121
| 816/VP/N/2017-18 | Circle 1 | Providing laying of interlocking from Rajendra Sing house to Awadh Ram house at Khushahal Nagar Sector-A | 0.00 | 25.80 23/01/2018 | 19/02/2018 12/02/2018 | 11/03/2018 | 19/02/2018 12/02/2018 | Sunil Construction Company 9415359763 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
122
| 889/VP/N/2017-18 | Circle 1 | Repairing and maintenance road in Sector-D at lalpur Phase-I | 0.00 | 21.01 23/01/2018 | 08/03/2018 26/02/2018 | 25/03/2018 | 08/03/2018 26/02/2018 | Akhilesh Associats 9628373523 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
123
| 1018/VP/N/2017-18 | Circle 1 | Construction of CC road lane No-8c Mobile tower to plot No. 73 Mahamoorganj, Varanasi. | 0.00 | 23.26 08/03/2018 | 30/03/2018 01/04/2018 | 31/05/2018 | 30/03/2018 01/04/2018 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
124
| 428/VP/N/2016-17 | Circle 1 | Patch repairing & BM SDC work in front of HIG at Lalpur Scheme. | 0.00 | 16.20 29/06/2016 | 06/08/2016 06/08/2016 | 05/10/2016 | 06/08/2016 06/08/2016 | Siddharth Construction 9415675937 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR DUBEY 7518102825 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
125
| 448/VP/N/2016-17 | Circle 1 | Patch repairing and BM SDC work in Sector-D at Lalpur | 0.00 | 22.07 29/06/2016 | 09/08/2016 09/08/2016 | 08/10/2016 | 09/08/2016 09/08/2016 | Akhilesh Associats 9628373523 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
126
| 970/VP/N/2015-16 | Circle 1 | Construction of cycle track from Ashapur Chauraha toward Kajjakpura Road varanasi | 0.00 | 87.88 14/12/2015 | 17/02/2016 09/03/2016 | 08/05/2016 | 17/02/2016 09/03/2016 | Vikesh and Associates 9795200444 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
127
| 992B/VP/N/2017-18 | Circle 1 | Maintenance of sewer, Road, Drain & disposal of malwa at Lalpur Awas Yogna Phase-I&II, Varanasi | 0.00 | 4.51 05/02/2018 | 29/03/2018 25/03/2018 | 24/09/2018 | 29/03/2018 25/03/2018 | Sanjiv Ranjan Srivastav 9336070099 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR DUBEY 7518102825 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
128
| 688/V/Pra/Ni/2016-17 | Circle 1 | P/L of BM and SDC work on internal road in Sector-B Lalpur Phase-1 | 0.00 | 28.27 27/09/2016 | 04/11/2016 22/10/2016 | 21/12/2016 | 04/11/2016 22/10/2016 | Vikesh and Associates 9795200444 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
129
| 507/VP/N/2016-17 | Circle 1 | Repairing of Park in North side of HIG at Lalpur Phase-I Varanasi | 0.00 | 2.20 29/06/2016 | 05/09/2016 05/09/2016 | 04/11/2016 | 05/09/2016 05/09/2016 | Sita Traders 9838964640 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
130
| 247/VP/N/2015-16 | Circle 1 | Improvement of road in SBI colony Pandeypur, Varanasi | 0.00 | 10.38 10/04/2015 | 28/05/2015 28/05/2015 | 27/07/2015 | 28/05/2015 28/05/2015 | | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
131
| 476/VP/N/14-15 | Circle 1 | Construction of road from main road to Rajkiya Balgriha, Ramnagar, Varanasi | 0.00 | 12.93 02/11/2014 | 03/12/2014 03/12/2014 | 02/01/2015 | 03/12/2014 03/12/2014 | Siddharth Construction 9415675937 | B.N. SINGH 9451251318 JE V.K GUPTA 7518102820 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
132
| 776/VP/N/2015-16 | Circle 1 | Repairing of Road from Nadeshar-Ghausabad-Chaukaghat Road, Varanasi | 0.00 | 7.86 04/12/2015 | 07/12/2015 04/12/2015 | 07/12/2015 | 07/12/2015 04/12/2015 | Siddharth Construction 9415675937 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
133
| 465/VP/N/2014-15 | Circle 1 | Construction of RCC road divider on Ravindrapuri-Lanka marg (Part-A) Varanasi | 0.00 | 34.93 14/11/2014 | 29/11/2014 29/11/2014 | 28/01/2015 | 29/11/2014 29/11/2014 | Manoj kumar singh 9415284031 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
134
| 412-A/VP/N/2014-15 | Circle 1 | Widening of Road from Mahavie Mandir to Pandaypur, Varanasi. part-A | 0.00 | 72.79 14/11/2014 | 03/12/2014 03/12/2014 | 02/02/2015 | 03/12/2014 03/12/2014 | | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
135
| 587/VP/N/2014-15 | Circle 1 | Construction of CC Road over cut stone pavement on Ashapur-paigamberpur-Kajjakpura Road Varanasi | 0.00 | 262.38 14/10/2014 | 27/01/2015 10/02/2015 | 09/04/2015 | 27/01/2015 10/02/2015 | Vikesh and Associates 9795200444 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
136
| 428/VP/N/2014-15 | Circle 1 | Painting of RCc Road Divider of Different Area Road of Varanasi City | 0.00 | 9.20 14/11/2014 | 29/11/2014 22/11/2014 | 06/12/2014 | 29/11/2014 22/11/2014 | | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
137
| 228/VP/N2015-16 | Circle 1 | P/L of 80mm thick rubberized molded paver block from Ashpur Chauraha to Kajjakpura, Varanasi | 0.00 | 158.58 10/04/2015 | 06/06/2015 27/06/2015 | 26/09/2015 | 06/06/2015 27/06/2015 | Akhilesh Associats 9628373523 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
138
| 274/VDA/N/2019-20 | Circle 1 | Cleaning and beautification of Nine Pond/Kunds at Varanasi. | 0.00 | 848.31 25/06/2019 | 08/07/2019 | 06/03/2020 | 08/07/2019 | Chinmay Construction 9236627810 | VIRENDRA KUMAR SINGH 9415576135 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
139
| 751/VDA/N/2018-19 | Circle 1 | Installation of Pt. Deen Dayal Upadhyay Ji Statue and Memorial Development in Padao Chouk (Ramnagar) | 0.00 | 2363.56 10/10/2018 | 17/11/2018 01/11/2018 | 30/04/2019 | 17/11/2018 01/11/2018 | CHINMAY CONSTRUCTION 9236627810 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
140
| 441/VDA/N/2018-19 | Circle 1 | Design & execution 60 feet high bronze statue work for Pt. Deen Dayal Upadhyay Memorial at Padao Chowk. | 0.00 | 621.00 05/06/2018 | 14/09/2018 10/08/2018 | 09/02/2019 | 14/09/2018 10/08/2018 | M/s Shilpam 9829012288 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
141
| 1179/VDA/N/2018-19 | Circle 1 | Construction of Nala from Karaudi Chauraha to Chhoti puliya at Panchkoshi Marg, Varanasi. | 0.00 | 7.55 22/02/2019 | 07/03/2019 06/03/2019 | 05/05/2019 | 07/03/2019 06/03/2019 | L S R Enterprises 9454351873 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
142
| 787/VDA/N/2018-19 | Circle 1 | Development work at B.H.U. Junction, Varanasi. | 0.00 | 133.37 15/09/2018 | 04/12/2018 06/11/2018 | 05/02/2019 | 04/12/2018 06/11/2018 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
143
| 732/VDA/N/2018-19 | Circle 1 | Rehabilitation of sewer line in VDA Colony Barigaibi, Varanasi. | 0.00 | 349.10 14/09/2018 | 06/02/2019 29/10/2018 | 27/06/2019 | 06/02/2019 29/10/2018 | M/S Verdhaman Engineering Works 9810057479 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
144
| 875/VDA/N/2018-19 | Circle 1 | | 0.00 | 41.54 20/11/2018 | 12/12/2018 01/02/2019 | 02/12/2018 | 12/12/2018 01/02/2019 | Ajay Electronics 9454352628 | O.P. TRIPATHI 7518102845 JE M.N. ANSHARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | In Progress |
145
| 418/VP/N/2018-19 | Circle 1 | Laying Trunk Sewer line at Lalpur Scheme Phase-I from S.T.P. to Ajamgarh Road, Varanasi. | 0.00 | 526.09 04/07/2018 | 10/08/2018 07/08/2018 | 06/02/2019 | 10/08/2018 07/08/2018 | JAGDAMBA ENTERPRISES 9839450794 | PARAS NATH 7518102827 JE ANIL KUMAR DUBEY 7518102825 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
146
| 890/VP/N/2017-18 | Circle 1 | Repairing and maintenance road in Sector-D at Lalpur Phase-I | 0.00 | 21.01 23/01/2018 | 08/03/2018 26/02/2018 | 25/03/2018 | 08/03/2018 26/02/2018 | Jwalamukhi Construction 9648999945 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
147
| 22/VP/N/2017-18 | Circle 1 | Supply and laying of RCC Hume Pipe NP-3 from Patrakarpuram Colony to Centrail Jail road Via Sikaraul Village Varanasi. | 0.00 | 59.25 04/11/2016 | 17/04/2017 17/04/2017 | 16/06/2017 | 17/04/2017 17/04/2017 | Pratap Enterprises 9161942660 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR DUBEY 7518102825 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
148
| 46/VP/N/2015-16 | Circle 1 | Construction of Auditorium Bhawan, Boundary wall, Gate, etc at police line Varanasi. | 0.00 | 93.11 21/01/2016 | 22/04/2016 22/04/2016 | 21/01/2017 | 22/04/2016 22/04/2016 | Singh Enterprises 9451893249 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
149
| 884/VP/N/2017-18 | Circle 1 | Repairing and BM SDC work (EWS & LIG) at Lalpur Sindhaura road Part-C | 0.00 | 40.23 23/01/2018 | 08/02/2018 26/02/2018 | 25/04/2018 | 08/02/2018 26/02/2018 | Akhilesh Associats 9628373523 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
150
| 308/VP/N/2018-19 | Circle 1 | Widening of road infront of Kuber Complex and reliance Jwelars, Varanasi. | 0.00 | 7.37 19/06/2018 | 17/07/2018 04/07/2018 | 03/09/2018 | 17/07/2018 04/07/2018 | Siddharth Construction 9415675937 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
151
| 784/VP/N/2018-19 | Circle 1 | Repairing and maintenance of internal road at Ramnagar VDA Colony, Varanasi. | 0.00 | 21.52 25/10/2018 | 04/12/2018 06/11/2018 | 05/02/2019 | 04/12/2018 06/11/2018 | Akhilesh Associats 9628373523 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
152
| 621/VP/N/2014-15 | Circle 1 | Painting work on Road Divider at Lalpur housing Scheme phase-1 Varanasi (on 24m Road) | 0.00 | 4.26 12/11/2014 | 25/02/2015 02/11/2014 | 06/11/2014 | 25/02/2015 02/11/2014 | Sanjiv Ranjan Srivastav 9336070099 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
153
| 139/VP/N/2015-16 | Circle 1 | Providing Sodium light on Khajuri Road & DIG Colony & Semi High mast Light at Kriahira Crossing in Varanasi | 0.00 | 4.30 20/03/2015 | 01/05/2015 01/05/2015 | 30/05/2015 | 01/05/2015 01/05/2015 | | B.N. SINGH 9451251318 JE M.N. ANSARI 7518102819 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
154
| 882/VP/N/2017-18 | Circle 1 | Widening of road from Sri Ram Nagar Colony near Maduadih Station Part-B | 0.00 | 65.58 23/01/2018 | 08/03/2016 26/02/2018 | 25/04/2018 | 08/03/2016 26/02/2018 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
155
| 668/VP/N/2014-15 | Circle 1 | Repairing of Park light st Ravidas Park Varanasi | 0.00 | 2.18 27/10/2014 | 18/03/2015 01/11/2014 | 06/11/2014 | 18/03/2015 01/11/2014 | Ajay Electronics 9454352628 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
156
| 925/VP/N/2018-19 | Circle 1 | Providing and laying of interlocking tiles on road side patari at lalpur Scheme Phase-I Varanasi. | 0.00 | 74.91 03/12/2018 | 26/12/2018 12/12/2018 | 11/01/2019 | 26/12/2018 12/12/2018 | M/s Arya Construction 9125151000 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
157
| 88/VP/N/2018-19 | Circle 1 | Construction of drain & interlocking tiles at Sanskritik Sankul Chaukaghat, Varanasi. | 0.00 | 29.44 06/02/2018 | 10/05/2018 25/04/2018 | 24/06/2018 | 10/05/2018 25/04/2018 | Akhilesh Associats 9628373523 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
158
| 735/VP/N/2016-17 | Circle 1 | P/L interlocking work on road patari and BM SDC work on road at Vijaygram Colony Jaitpura Ward. | 0.00 | 25.64 27/09/2016 | 23/11/2016 04/11/2016 | 03/01/2017 | 23/11/2016 04/11/2016 | Jwalamukhi Construction 9648999945 | B.N. SINGH 9451251318 JE A.K SAXENA 9628372907 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
159
| 886/VP/N/15-16 | Circle 1 | Providing and Laying Interlocking block in remaining area of Bhutpurva Sainik Kalyan Nigam Collectrate Varanasi | 0.00 | 5.69 14/12/2015 | 30/01/2016 30/01/2016 | 29/02/2016 | 30/01/2016 30/01/2016 | | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
160
| 822/VP/N/2017-18 | Circle 1 | Providing and laying of interlocking work at Bajarang Vihar Colony Taktakpur, Varanasi. Part-A | 0.00 | 24.18 23/01/2018 | 19/03/2018 12/02/2018 | 11/04/2018 | 19/03/2018 12/02/2018 | Sunil Construction Company 9415359763 | CHANDRA SHEKHAR PRASAD 7518102826 JE ANIL KUMAR DUBEY 7518102825 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
161
| 779/VP/N/2015-16 | Circle 1 | Supply & Fixing of median marker stell body solar stud, HIP LDS on different road and RCC divider, Varanasi | 0.00 | 3.50 04/12/2015 | 05/12/2015 05/12/2015 | 07/12/2015 | 05/12/2015 05/12/2015 | Arun Enterprises 9415204593 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
162
| 627/VP/N/2014-15 | Circle 1 | Repairing of Bathroom (In St. Ravidas park) and damages retaining wall at St. Ravidas Park Nagwa, Varanasi | 0.00 | 5.46 27/10/2014 | 24/02/2015 01/11/2014 | 15/12/2014 | 24/02/2015 01/11/2014 | | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
163
| 463/VP/N/2014-15 | Circle 1 | Cleaning of Nala at Ramnagar Housing Scheme, Varanasi | 0.00 | 4.45 14/11/2014 | 26/11/2014 29/11/2014 | 28/12/2014 | 26/11/2014 29/11/2014 | Pratap Enterprises 9161942660 | B.N.SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
164
| 780/VP/N/2015-16 | Circle 1 | Painting Work on RCC Divider at Different Road in Varanasi | 0.00 | 5.04 04/12/2015 | 06/12/2015 04/12/2015 | 07/12/2015 | 06/12/2015 04/12/2015 | Sanjiv Ranjan Srivastav 9336070099 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
165
| 633/VP/N/2013-14 | Circle 1 | Widening & Development work of Bjojibir Tiraha from Doodh Satti to Vishal Mega mart, Varanasi | 0.00 | 123.36 22/10/2013 | 05/12/2013 05/12/2013 | 04/01/2014 | 05/12/2013 05/12/2013 | Akhilesh Associats 9628373523 | B.N.SINGH 9451251318 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
166
| 234/VP/N/ 2013-14 | Circle 1 | Repairing & Maintenance of Road from Cantt Bus Station to (Panchwati Mandir) maldahiya Tiraha Varanasi | 0.00 | 29.20 08/05/2013 | 05/06/2013 07/06/2013 | 06/09/2013 | 05/06/2013 07/06/2013 | Akhilesh Associats 9628373523 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
167
| 364-B/VP/N/2014-15 | Circle 1 | P/L of BM SDC work from Stadium to OHT on 24 meter Rord of Lalpur Yojana Phase-1 (Paet-D) Varanasi | 0.00 | 41.47 05/11/2014 | 14/11/2014 07/11/2014 | 13/11/2014 | 14/11/2014 07/11/2014 | Akhilesh Associats 9628373523 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
168
| 836-A/VP/N/2015-16 | Circle 1 | P/L Patch Repairing work and BM /sdbc on old surface at Hukulganj to Pandaypur, VARANASI (Part-A) | 0.00 | 49.35 29/09/2015 | 30/12/2015 30/12/2015 | 30/01/2016 | 30/12/2015 30/12/2015 | Akhilesh Associats 9628373523 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR DUBEY 7518102825 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
169
| 364-A/VP/N/2014-15 | Circle 1 | P/L of BM SDC work from 24 meter Road to OHT of Lalpur Yozana Phase-1 (Part-C), Varanasi | 0.00 | 43.24 05/11/2014 | 14/12/2014 07/11/2014 | 13/11/2014 | 14/12/2014 07/11/2014 | Akhilesh Associats 9628373523 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
170
| 372/VP/N/2015-16 | Circle 1 | Widining of Road from Ashapur Chauraha to Kajjakpura Railway under bridge except CC Road portion, Varanasi (Part-D) | 0.00 | 155.60 10/04/2015 | 17/06/2015 18/06/2015 | 17/09/2015 | 17/06/2015 18/06/2015 | Akhilesh Associats 9628373523 | B.N. SINGH 9451251318 JE ANIL KUMAR DUBEY 7518102825 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
171
| 611/VP/N/2016-17 | Circle 1 | Repairing of Two Park at DIG Colony, Varanasi | 0.00 | 11.24 17/08/2016 | 20/09/2016 20/09/2016 | 19/11/2016 | 20/09/2016 20/09/2016 | Siddharth Construction 9415675937 | SURESH KUMAR 7905982953 JE V.K GUPTA 7518102820 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
172
| 543/VP/N/2016-17 | Circle 1 | S/L of Stone Chauka from Sh. Parmanand Maurya house to Sh. Dara Yadav at Ramnagar, Varanasi | 0.00 | 34.66 29/06/2016 | 30/08/2016 30/08/2016 | 29/10/2016 | 30/08/2016 30/08/2016 | Dev Enterprises 6454000083 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
173
| 477/VP/N/2014-15 | Circle 1 | Construction of U-type Drain from PAC Post Office to Munnalal Sonkar House (On Left side of proposed CC road) at Ramnagar, Varanasi | 0.00 | 39.40 14/11/2014 | 03/12/2014 03/12/2014 | 02/02/2015 | 03/12/2014 03/12/2014 | Dev Enterprises 6454000083 | B.N. SINGH 9451251318 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
174
| 484/VP/N/2014-15 | Circle 1 | Widening of Hukulganj Road Chaukaghat Tiraha to Pandaypur Chauraha Varanasi (Part-A) | 0.00 | 59.60 14/11/2014 | 04/12/2014 04/12/2014 | 03/02/2015 | 04/12/2014 04/12/2014 | Akhilesh Associats 9628373523 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
175
| 158/VP/N/2015-16 | Circle 1 | Construction of Drain from Karudi Chauraha to NH-2 Bypass via Suswahi Karamanbirpur, Varanasi | 0.00 | 175.55 20/03/2015 | 07/05/2015 07/05/2015 | 06/11/2015 | 07/05/2015 07/05/2015 | Pratap Enterprises 9161942660 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
176
| 722/VP/N/2016-17 | Circle 1 | Construction of Divider from Police Line Crossing to Tarikhana via Maqbool Alam Road, Varanasi | 0.00 | 75.45 04/10/2016 | 07/12/2016 02/11/2016 | 01/01/2017 | 07/12/2016 02/11/2016 | | B.N. SINGH 9451251318 JE ANIL KUMAR DUBEY 7518102825 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
177
| 1070/VP/N/2013-14 | Circle 1 | Construction of boundary wall at Patrakarpuram Yozana, Varanasi | 0.00 | 21.78 20/02/2014 | 05/03/2014 05/03/2014 | 04/04/2014 | 05/03/2014 05/03/2014 | Sanjiv Ranjan Srivastav 9336070099 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
178
| 808/VP/N/2016-17 | Circle 1 | Dismantling and resenting of Stone Chauka at Navapura Ward Iswargangi, Katuapura Ward, Luxa ward & Jaitpura Ward | 0.00 | 41.25 04/10/2016 | 28/11/2016 22/11/2016 | 21/01/2017 | 28/11/2016 22/11/2016 | R.P. Associates 9415303809 | B.N. SINGH 9451251318 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
179
| 720/VP/N/2016-17 | Circle 1 | P/L of BM SDC work from Petrol Pump towards Raghunath Nagar Colony Mahmoorganj | 0.00 | 17.45 27/09/2016 | 07/12/2016 02/11/2016 | 01/01/2017 | 07/12/2016 02/11/2016 | Akhilesh Associats 9628373523 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
180
| 927/VP/N/2015-16 | Circle 1 | Widing of road from Karaundi Chauraha to Chitaipur road remaining part, Varanasi | 0.00 | 86.89 29/09/2015 | 23/02/2016 23/02/2016 | 22/04/2016 | 23/02/2016 23/02/2016 | Akhilesh Associats 9628373523 | B.N. SINGH 9451251318 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
181
| 561/VP/N/2016-17 | Circle 1 | Construction of Park at Bramhanand Nagar Colony in-front of Plot No. 68 to 72, Varanasi | 0.00 | 14.01 29/09/2015 | 03/09/2016 03/09/2016 | 02/11/2016 | 03/09/2016 03/09/2016 | | B.N. SINGH 9451251318 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
182
| 32/VP/N/2016-17 | Circle 1 | Construction of drain from Karaundi Chauraha to NH-2 Bypass via Suswahi Karamanbir, Varanasi (Part-A) | 0.00 | 73.90 30/12/2015 | 12/05/2016 12/05/2016 | 11/07/2016 | 12/05/2016 12/05/2016 | Jwalamukhi Construction 9648999945 | B.N. SINGH 9451251318 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
183
| 523/VP/N/2016-17 | Circle 1 | P/L of Chauka from Gayghat Aditya General Store to Bhirawanath Mandir Chauraha, Varanasi | 0.00 | 9.95 29/06/2016 | 29/08/2016 29/08/2016 | 28/10/2016 | 29/08/2016 29/08/2016 | | B.N. SINGH 9451251318 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
184
| 385/VP/N/2019-20 | Circle 1 | Laying sewer line from Sri R.K. Singh house to DLW Railway line at Village Hasanpur, (Part-B) | 0.00 | 8.93 06/07/2019 | 01/08/2019 31/07/2019 | 30/08/2019 | 01/08/2019 31/07/2019 | P.K. Construction Company 9452564777 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
185
| 384/VP/N/2019-20 | Circle 1 | Laying sewer line from Satyam tiles to Sri R.K. Singh house at Village- Hasanpur, Varanasi. | 0.00 | 8.79 06/07/2019 | 01/08/2019 31/07/2019 | 30/08/2019 | 01/08/2019 31/07/2019 | P.K. Construction Company 9452564777 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
186
| 987/VP/N/2015-16 | Circle 1 | Improvement of Road Work at Commissioner Office Compound, Varanasi | 0.00 | 9.85 20/02/2016 | 11/03/2016 14/03/2016 | 29/03/2016 | 11/03/2016 14/03/2016 | Siddharth Construction 9415675937 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
187
| 386/VP/N/2019-20 | Circle 1 | Interlocking tiles & sewer line work at VDA Campus building back side, Varanasi. | 0.00 | 5.78 09/07/2019 | 01/08/2019 05/08/2019 | 04/09/2019 | 01/08/2019 05/08/2019 | Manoj kumar singh 9415284031 | AMAR NATH YADAV 7518102835 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
188
| 988/VP/N/2015-16 | Circle 1 | Improvement of Road work between Connecting DIG Colony and DIG office, Varanasi | 0.00 | 4.98 20/02/2016 | 11/03/2016 14/03/2016 | 29/03/2016 | 11/03/2016 14/03/2016 | Siddharth Construction 9415675937 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
189
| 114/VP/N/2016-17 | Circle 1 | S/F of stone chauka from Kabragah to Arun patel House 7 Kallu yadav House to R.P. Singh House at Ramnagar, Varanasi | 0.00 | 26.00 08/03/2016 | 27/05/2016 27/05/2016 | 26/06/2016 | 27/05/2016 27/05/2016 | Dev Enterprises 6454000083 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
190
| 1018/VP/N/2015-16 | Circle 1 | Construction of Pathway at Shaivpuri Colony Park, Nagawa, Varanasi | 0.00 | 6.10 30/12/2015 | 31/03/2016 31/03/2016 | 30/04/2016 | 31/03/2016 31/03/2016 | Purvanchal Construction 9161884000 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
191
| 775/VP/N/2015-16 | Circle 1 | Repairing of Road & SDVC work from Lahurabir to Maidagin road, Varanasi | 0.00 | 5.25 04/12/2015 | 05/12/2015 05/12/2015 | 07/12/2015 | 05/12/2015 05/12/2015 | Akhilesh Associats 9628373523 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
192
| 889/VP/N/2015-16 | Circle 1 | Relaying/Reseting of old existing stone chauka at ward no. 04 and 58 Varanasi (part-A) | 0.00 | 9.12 30/12/2015 | 01/02/2016 01/02/2016 | 31/03/2016 | 01/02/2016 01/02/2016 | Vaisno Enterprises 8859794188 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
193
| 212/VP/N/2016-17 | Circle 1 | Renovation of General Toilet(G/F) near store and FF &SF with painting and washing and construction of modular kitchen for VC office in caft room Varanasi | 0.00 | 9.18 31/05/2016 | 24/06/2016 24/06/2016 | 09/07/2016 | 24/06/2016 24/06/2016 | Siddharth Construction 9415675937 | SURESH KUMAR 7905982953 JE V.K GUPTA 7518102820 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
194
| 811/VP/N/2015-16 | Circle 1 | Repairing of pumpset in Sant Ravidas Park at Nagawa, Varanasi. | 0.00 | 0.16 30/11/2015 | 05/01/2016 03/09/2015 | 06/09/2015 | 05/01/2016 03/09/2015 | Sanjay singh sarin and company 9336902909 | TEST JE 9045929210 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
195
| 957/VP/N/2015-16 | Circle 1 | Changing of main switch at Lalpur Phase-I, Varanasi | 0.00 | 0.11 21/01/2016 | 01/03/2016 01/03/2016 | 06/03/2016 | 01/03/2016 01/03/2016 | Ajay Electronics 9454352628 | TEST JE 9045929210 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
196
| 956/VP/N/2015-16 | Circle 1 | Light arrangement in New LIC Construction Building at Sigra Varansasi. | 0.00 | 0.30 21/01/2016 | 01/03/2016 01/03/2016 | 06/03/2016 | 01/03/2016 01/03/2016 | Ajay Electronics 9454352628 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
197
| 336/VP/N/2015-16 | Circle 1 | Relaying/Reseting of old existing stone chauka at ward no-24 Teliyabag & Ward no-60 Luxa, Varanasi | 0.00 | 11.58 19/05/2015 | 06/06/2015 08/06/2015 | 07/07/2015 | 06/06/2015 08/06/2015 | Vaisno Enterprises 8859794188 | ANSHU 0000000000 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
198
| 799/VP/N/2015-16 | Circle 1 | Construction of Road from TVS Show room to Sonkar basti at Varanasi to Jaunpur marg, Varanasi | 0.00 | 31.48 29/09/2015 | 10/12/2015 10/12/2015 | 10/01/2016 | 10/12/2015 10/12/2015 | | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
199
| 980/VP/N/2015-16 | Circle 1 | Painting and Repairing work of Subhah-e- Baranas Mundap Assi Ghat, Varanasi | 0.00 | 0.90 02/02/2016 | 11/03/2016 11/03/2016 | 18/03/2016 | 11/03/2016 11/03/2016 | Sandeep Kumar Pandey 9451580336 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
200
| 56/VP/N/2016-17 | Circle 1 | Repairing and painting work of Assistant Joint planner Office at Jawahar Lal Nehru Englishiya Line Shopping complex, Varanasi | 0.00 | 2.75 08/03/2016 | 30/04/2016 01/05/2016 | 31/05/2016 | 30/04/2016 01/05/2016 | Sanjiv Ranjan Srivastav 9336070099 | ANSHU 0000000000 JE A.K SAXENA 9628372907 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
201
| 216/VP/N/2016-17 | Circle 1 | Boring work & Supply and fixing of IHP submersible pump set in VDA Campus | 0.00 | 1.62 08/03/2016 | 24/06/2016 24/06/2016 | 09/07/2016 | 24/06/2016 24/06/2016 | Manoj kumar singh 9415284031 | SURESH KUMAR 7905982953 JE V.K GUPTA 7518102820 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
202
| 434/VP/N/2015-16 | Circle 1 | Supply of Pump set with panel and repairing of burnt pump set at Lalpur Housing Scheme Phase-1. Varanasi | 0.00 | 3.48 02/06/2015 | 03/07/2015 03/07/2015 | 09/07/2015 | 03/07/2015 03/07/2015 | Sanjay singh sarin and company 9336902909 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
203
| 349/VP/N/2015-16 | Circle 1 | Repairing & Painting work of site office of Tube well at Lalpur Phase-I, Varanasi | 0.00 | 1.95 29/04/2015 | 11/06/2015 12/06/2015 | 11/07/2015 | 11/06/2015 12/06/2015 | Sanjiv Ranjan Srivastav 9336070099 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
204
| 210/VP/N/2016-17 | Circle 1 | S/M of MS Notice/Information Board at Varuna River bank Varanasi | 0.00 | 0.76 17/05/2016 | 21/06/2016 24/06/2016 | 30/06/2016 | 21/06/2016 24/06/2016 | Sanjay singh sarin and company 9336902909 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
205
| 211/VP/N/2016-17 | Circle 1 | S/L of GI Pipe from Jal Sansthan Tube well to both side of foundation for filling in foundation water body, Varanasi | 0.00 | 1.61 26/05/2016 | 24/06/2016 24/06/2016 | 30/06/2016 | 24/06/2016 24/06/2016 | Sanjay singh sarin and company 9336902909 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
206
| 959/VP/N/2015-16 | Circle 1 | Light replacement & arrangement at Sankul Chaukaghat, Varanasi | 0.00 | 0.74 21/01/2016 | 01/03/2016 01/03/2016 | 06/03/2016 | 01/03/2016 01/03/2016 | Ajay Electronics 9454352628 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
207
| 752/VP/N/2015-16 | Circle 1 | Providing Lighting, repairing & arrangement at Sant Ravidas Park Nagawa, Varanasi | 0.00 | 0.98 17/11/2015 | 19/11/2015 19/11/2015 | 22/11/2015 | 19/11/2015 19/11/2015 | Ajay Electronics 9454352628 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
208
| 958/VP/N/2015-16 | Circle 1 | Light arrangement through panel in internal VDA building, Varanasi | 0.00 | 0.48 21/01/2016 | 01/03/2016 01/03/2016 | 06/03/2016 | 01/03/2016 01/03/2016 | Ajay Electronics 9454352628 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
209
| 777/VP/N/2015-16 | Circle 1 | Repairing of road from Chaukaghat-Teliyabag road, Varanasi | 0.00 | 8.74 04/12/2015 | 05/12/2015 04/12/2015 | 07/12/2015 | 05/12/2015 04/12/2015 | Jwalamukhi Construction 9648999945 | R.P SINGH 0000000000 JE V.K GUPTA 7518102820 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
210
| 967/VP/N/2015-16 | Circle 1 | Providing Lighting arrangement at Mahamanapuri to Sushwahi road, Varanasi. | 0.00 | 3.59 20/02/2016 | 04/03/2016 04/03/2016 | 03/04/2016 | 04/03/2016 04/03/2016 | Sanjay singh sarin and company 9336902909 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
211
| 214/VP/N/2016-17 | Circle 1 | Painting Work of Varuna bridge railing, Nadesar, Cantoment park, Divider near Taj Hotal, Divider cant station etc., Varanasi | 0.00 | 3.60 26/05/2016 | 24/06/2016 24/06/2016 | 30/06/2016 | 24/06/2016 24/06/2016 | Siddharth Construction 9415675937 | B.N. SINGH 9451251318 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
212
| 934/VP/N/2015-16 | Circle 1 | Construction of boundary wall and S/F of Kota Stone in Campus of community center at Patrakarpuram Yozana, Varanasi. | 0.00 | 23.46 29/09/2015 | 18/12/2015 17/12/2015 | 18/02/2016 | 18/12/2015 17/12/2015 | Kumar and Company 9415301893 | ANSHU 0000000000 JE V.K GUPTA 7518102820 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
213
| 887/VP/N/2015-16 | Circle 1 | Providing Sodium Light in Janki Nagar Colony Samane Ghat & S/F of Semi High mast Light in Saket Nagar park no.2 and repairing of semi high mast light in Saket Nagar park No-01. Varanasi | 0.00 | 3.94 30/12/2015 | 30/01/2016 31/01/2016 | 29/02/2016 | 30/01/2016 31/01/2016 | Sanjay singh sarin and company 9336902909 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
214
| 348/VP/N/2015-16 | Circle 1 | P/L of Rubrised molded interlocking in remaining part in Udyan Vibhag Park, Varanasi | 0.00 | 12.28 19/05/2015 | 11/06/2015 12/06/2015 | 11/07/2015 | 11/06/2015 12/06/2015 | Arun Enterprises 9415204593 | B.N. SINGH 9451251318 JE V.K GUPTA 7518102820 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
215
| 782/VP/N/2015-16 | Circle 1 | Repairing of road from maidagin to Godauliya road, Varanasi | 0.00 | 13.11 04/12/2015 | 05/12/2015 05/12/2015 | 07/12/2015 | 05/12/2015 05/12/2015 | Akhilesh Associats 9628373523 | ANSHU 0000000000 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
216
| 893/VP/N/2015-16 | Circle 1 | P/L of interlocking Pavement block from Dr. Sharma House to House No. D-65/478B Lahartara on Varanasi- Allahabad Marg. | 0.00 | 2.34 30/12/2015 | 17/02/2016 05/02/2016 | 20/02/2016 | 17/02/2016 05/02/2016 | Dev Enterprises 6454000083 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
217
| 981/VP/N/2015-16 | Circle 1 | providing & Laying rubberized interlocking block in remaining area of Jila Udyan Parisar, Varanasi | 0.00 | 3.90 02/03/2016 | 11/03/2016 11/03/2016 | 26/03/2016 | 11/03/2016 11/03/2016 | Arun Enterprises 9415204593 | B.N. SINGH 9451251318 JE V.K GUPTA 7518102820 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
218
| 234/VP/N/2016-17 | Circle 1 | Painting work of divider bypass Jaunpur road, St. Atulanand School boundary side gril and Jail, Goal Chauraha & Bargad Tree Gril. | 0.00 | 0.85 26/05/2016 | 04/07/2016 04/07/2016 | 11/07/2016 | 04/07/2016 04/07/2016 | Dev Enterprises 6454000083 | B.N. SINGH 9451251318 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
219
| 662/VP/N/2016-17 | Circle 1 | Supply and Installation of 125 KVA DG Set at Auditorium Commissioner Varanasi. | 0.00 | 12.32 20/09/2016 | 13/10/2016 11/10/2016 | 26/10/2016 | 13/10/2016 11/10/2016 | | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
220
| 526/VP/N/2016-17 | Circle 1 | P/L Rubber molded interlocking from H. No. 2/130 to Sahitya Naka main road at Ramnagar, Varanasi | 0.00 | 9.51 29/06/2016 | 29/08/2016 29/08/2016 | 28/09/2016 | 29/08/2016 29/08/2016 | Vaisno Enterprises 8859794188 | ANSHU 0000000000 JE V.K GUPTA 7518102820 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
221
| 704/VP/N/2016-17 | Circle 1 | Supply & fixing of sodium light on road and reseting of stone chauka from Madanpura road to Ganga Ghat, Varanasi | 0.00 | 0.95 04/10/2016 | 24/11/2016 24/10/2016 | 23/11/2016 | 24/11/2016 24/10/2016 | Ajay Electronics 9454352628 | B.N.SINGH 9451251318 JE M.N. ANSARI 7518102819 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
222
| 541/VP/N/2016-17 | Circle 1 | S/L of Stone chauka from Tiwari katara to Let. B.P. Sing House to Sri. Ganga Singh house at Ramnagar, Varanasi | 0.00 | 26.86 29/06/2016 | 30/08/2016 30/08/2016 | 29/10/2016 | 30/08/2016 30/08/2016 | Bhootnath Associats 9839110971 | ANSHU 0000000000 JE R.S CHAUDHARY 7518102818 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
223
| 569/VP/N/2016-17 | Circle 1 | Patch repainting & BM SDC work in Sector-C at Lalpur Phase-I, Varanasi | 0.00 | 18.76 29/06/2016 | 03/09/2016 03/09/2016 | 02/11/2016 | 03/09/2016 03/09/2016 | | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
224
| 576/VP/N/2016-17 | Circle 1 | P/L of Chekard tiles on divider at Lalpur Phase-I, Varanasi | 0.00 | 6.57 29/06/2016 | 05/09/2016 05/09/2016 | 04/10/2016 | 05/09/2016 05/09/2016 | Pratap Enterprises 9161942660 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
225
| 731//VP/N/2016-17 | Circle 1 | P/L/ of BM SDC work from Pitarkunda Tiraha via Pichashmochan to Maldahiya, Varanasi | 0.00 | 33.93 27/09/2016 | 19/11/2016 04/11/2016 | 03/01/2017 | 19/11/2016 04/11/2016 | Siddharth Construction 9415675937 | B.N. SINGH 9451251318 JE ANIL KUMAR YADAV 9473618605 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
226
| 542/VP/N/2016-17 | Circle 1 | S/L/ of Stone Chauka from Naranyan Sonkar House to Vimlesh Singh to Gopal Pandey at Ramnagar, Varanasi | 0.00 | 16.67 29/06/2016 | 30/08/2016 30/08/2016 | 29/10/2016 | 30/08/2016 30/08/2016 | Bhootnath Associats 9839110971 | B.N. SINGH 9451251318 JE V.K GUPTA 7518102820 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
227
| 664/VP/N/2016-17 | Circle 1 | P/L of Sewer Line at Ramnagar Awasiya Yojana, Varanasi | 0.00 | 29.83 17/08/2016 | 03/10/2016 03/10/2016 | 02/12/2016 | 03/10/2016 03/10/2016 | Vaisno Enterprises 8859794188 | ANSHU 0000000000 JE OM PRAKASH GUPTA 0000000000 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
228
| 789/VP/N/2016-17 | Circle 1 | Repairing drain work of surrounding Ambedkar Stadium at Lalpur, Varanasi | 0.00 | 18.67 04/10/2016 | 17/12/2016 17/11/2016 | 16/01/2017 | 17/12/2016 17/11/2016 | Pratap Enterprises 9161942660 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
229
| 676/VP/N/2016-17 | Circle 1 | P/L of interlocking Pavement from H.N. S-2/51 to S-2/51 E near Circuit House Varanasi | 0.00 | 7.19 17/08/2016 | 21/10/2016 19/10/2016 | 18/11/2016 | 21/10/2016 19/10/2016 | Dinesh singh 9415799588 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
230
| 697/VP/N/2016-17 | Circle 1 | S/F of CC Curve stone and bollard on cycyle trac at Lalpur Yojana, Varanasi | 0.00 | 14.32 07/10/2016 | 09/01/2017 24/10/2016 | 23/11/2016 | 09/01/2017 24/10/2016 | Sanjiv Ranjan Srivastav 9336070099 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
231
| 562/VP/N/2016-17 | Circle 1 | Repairing of sewer line at Lalpur Phase-I, Varanasi | 0.00 | 19.03 29/06/2016 | 03/09/2016 03/09/2016 | 02/11/2016 | 03/09/2016 03/09/2016 | Sanjiv Ranjan Srivastav 9336070099 | B.N. SINGH 9451251318 JE A.K SAXENA 9628372907 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
232
| 677/VP/N/2016-17 | Circle 1 | Construction of Park in Sector-C in front of Plot No. 308 at Lalpur Phase-I Varanasi | 0.00 | 11.12 17/08/2016 | 07/11/2016 19/10/2016 | 18/12/2016 | 07/11/2016 19/10/2016 | Pratap Enterprises 9161942660 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
233
| 709/VP/N/2016-17 | Circle 1 | Providing interlocking for Vehicle Stand in Back side advocates building at commissioner office Campus, Varanasi | 0.00 | 5.21 07/10/2016 | 19/11/2016 26/11/2016 | 25/11/2016 | 19/11/2016 26/11/2016 | Siddharth Construction 9415675937 | SURESH KUMAR 7905982953 JE V.K GUPTA 7518102820 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
234
| 698/VP/N/2016-17 | Circle 1 | S/F of CC Curve stone and bolard on Cycle track at Lalpur, yojana, Lalpur | 0.00 | 14.32 07/10/2016 | 21/10/2016 04/10/2016 | 23/11/2016 | 21/10/2016 04/10/2016 | Vaisno Enterprises 8859794188 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
235
| 563/VP/N/2016-17 | Circle 1 | Laying of New Water Line work at Lalpur Phase-I, Varanasi | 0.00 | 6.14 29/06/2016 | 03/09/2016 03/09/2016 | 02/11/2016 | 03/09/2016 03/09/2016 | Sanjiv Ranjan Srivastav 9336070099 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
236
| 564/VP/N/2016-17 | Circle 1 | P/L of interlocking & drain repair in North Side at Lalpur Phase-I, Varanasi | 0.00 | 18.78 29/06/2016 | 03/09/2016 03/09/2016 | 02/11/2016 | 03/09/2016 03/09/2016 | Sanjiv Ranjan Srivastav 9336070099 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
237
| 522/VP/N/2016-17 | Circle 1 | Construction of Park in Sector-B at Lalpur Phase-I, Varanasi | 0.00 | 12.79 29/06/2016 | 29/08/2016 29/08/2016 | 28/10/2016 | 29/08/2016 29/08/2016 | Pratap Enterprises 9161942660 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
238
| 769/VP/N/2016-17 | Circle 1 | P/L of interlocking from H.N. K-66/1D Maharaj Bhawan Koatwali ward and from Shiva Temple to near Raju House Chetaganj ward. | 0.00 | 21.35 04/10/2016 | 18/11/2016 12/11/2016 | 11/01/2017 | 18/11/2016 12/11/2016 | Deena Nath Gupta 9415696273 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
239
| 689/VP/N/2016-17 | Circle 1 | Construction of Park at Sanjay nagar Colony infront of EWS block at Jaitpura ward, Varanasi | 0.00 | 14.66 04/10/2016 | 21/10/2016 22/10/2016 | 21/12/2016 | 21/10/2016 22/10/2016 | Vaisno Enterprises 8859794188 | B.N. SINGH 9451251318 JE V.K GUPTA 7518102820 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
240
| 688/VP/N/2016-17 | Circle 1 | P/L of Bm SDC work on internal road in Sector-B Lalpur Phase-I, Varanasi | 0.00 | 28.27 27/09/2016 | 04/11/2016 22/10/2016 | 21/12/2016 | 04/11/2016 22/10/2016 | Vikesh and Associates 9795200444 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
241
| 575/VP/N/2016-17 | Circle 1 | Repairing of Park in North Side of HIG at Lalpur Phase-I, Varanasi | 0.00 | 1.87 29/06/2016 | 05/09/2016 05/09/2016 | 04/11/2016 | 05/09/2016 05/09/2016 | Sita Traders 9838964640 | B.N. SINGH 9451251318 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
242
| 685/VP/N/2016-17 | Circle 1 | P/L of interlocking and KC drain work from SM plot no. 196 mauza Pahariya to Mohan yadav House near Ashok Vihar colony Phase-II varanasi | 0.00 | 2.28 04/10/2016 | 21/10/2016 22/10/2016 | 31/12/2016 | 21/10/2016 22/10/2016 | | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
243
| 663/VP/N/2016-17 | Circle 1 | Providing, fixing & installation of RO with stabilizer in Auditorium, Commissioner Varanasi | 0.00 | 1.26 20/09/2016 | 07/10/2016 04/10/2016 | 19/10/2016 | 07/10/2016 04/10/2016 | | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
244
| 525/P/N/2016-17 | Circle 1 | P/L of interlocking pavement at Taigor Town Colony in side of Park Wall | 0.00 | 11.09 29/06/2016 | 29/08/2016 29/08/2016 | 28/10/2016 | 29/08/2016 29/08/2016 | Vaisno Enterprises 8859794188 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
245
| 466/VP/N/2016-17 | Circle 1 | Repairing of park in Sector-C at lalpur Phase-I, Varanasi | 0.00 | 6.05 29/06/2016 | 11/08/2016 10/08/2016 | 10/10/2016 | 11/08/2016 10/08/2016 | Singh Enterprises 9451893249 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
246
| 610/VP/N/2016-17 | Circle 1 | Supply and fixing of multi seater chrome benches (3 in 1) in office chairman VDA Varannasi | 0.00 | 1.95 17/08/2016 | 20/09/2016 20/09/2016 | 06/10/2016 | 20/09/2016 20/09/2016 | | SURESH KUMAR 7905982953 JE V.K GUPTA 7518102820 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
247
| 565/VP/N/2016-17 | Circle 1 | improvement of road from Lahartara GT road to Kabirmath Pasiyani Gali Varanasi | 0.00 | 10.78 29/06/2016 | 03/09/2016 03/09/2016 | 02/11/2016 | 03/09/2016 03/09/2016 | Shreeram Enterprises 9415223530 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
248
| 427/VP/N/2016-17 | Circle 1 | Patch Repairing & BM SDC work in sector-C at Lalpur Phase-I, Varanasi | 0.00 | 4.82 29/06/2016 | 06/08/2016 06/08/2016 | 05/09/2016 | 06/08/2016 06/08/2016 | Siddharth Construction 9415675937 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
249
| 701-B/VP/N/2016-17 | Circle 1 | Electric Supply work for Sound system at Ganga Ghat, Varanasi | 0.00 | 0.19 21/10/2016 | 21/12/2016 16/12/2015 | 17/12/2015 | 21/12/2016 16/12/2015 | Ajay Electronics 9454352628 | R.P SINGH 0000000000 JE OM PRAKASH GUPTA 0000000000 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
250
| 590/VP/N/2016-17 | Circle 1 | Light replacement & arrangement at Sankul Chaukaghat, Varanasi | 0.00 | 0.61 20/08/2016 | 14/09/2016 14/09/2016 | 21/09/2016 | 14/09/2016 14/09/2016 | Sanjay singh sarin and company 9336902909 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
251
| 671/VP/N/2016-17 | Circle 1 | Supply and fixing of 100 KVA transformer for 08 LIG and 12 Shop at Lalpur Scheme Phase-II | 0.00 | 5.87 20/09/2016 | 07/10/2016 07/10/2016 | 06/12/2016 | 07/10/2016 07/10/2016 | Ajay Electronics 9454352628 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
252
| 738/VP/N/2016-17 | Circle 1 | Repairing of damaged pathway and painting of park and repairing of approach road inside of Sant Ravidas park Nagaw, Varanasi | 0.00 | 4.32 27/10/2016 | 02/11/2016 02/11/2016 | 17/11/2016 | 02/11/2016 02/11/2016 | Sanjay singh sarin and company 9336902909 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
253
| 747/VP/N/2016-17 | Circle 1 | finishing/painting of wall grill and other work at Ravida park & Ghat nagawa | 0.00 | 5.84 21/06/2016 | 04/11/2016 04/11/2016 | 09/11/2016 | 04/11/2016 04/11/2016 | Sanjay singh sarin and company 9336902909 | R.P SINGH 0000000000 JE OM PRAKASH GUPTA 0000000000 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
254
| 701-C/VP/N/2016-17 | Circle 1 | Repairing of fountain Pump in Sant Ravidas Park at Nagawa, Varanasi | 0.00 | 0.16 21/10/2016 | 21/12/2016 04/11/2015 | 06/11/2015 | 21/12/2016 04/11/2015 | Ajay Electronics 9454352628 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
255
| 610-A/VP/N/2016-17 | Circle 1 | Repairing of STp Pump panel at Lalpur housing Scheme Phase-I, Varanasi | 0.00 | 0.18 20/09/2016 | 03/01/2017 04/07/2016 | 08/07/2016 | 03/01/2017 04/07/2016 | Sanjay singh sarin and company 9336902909 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
256
| 611-A/VP/N/2016-17 | Circle 1 | Exchange of cutout and repairing of work in pump house at Lalpur Houseing Scheme phase-I, Varanasi | 0.00 | 0.09 20/09/2016 | 03/01/2017 17/05/2016 | 18/05/2016 | 03/01/2017 17/05/2016 | Sanjay singh sarin and company 9336902909 | R.P SINGH 0000000000 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
257
| 538/VP/N/2016-17 | Circle 1 | P/L of interlocking & drain repair in South side at Lalpur phase-I, Varanasi | 0.00 | 35.64 29/06/2016 | 29/08/2016 29/08/2016 | 28/10/2016 | 29/08/2016 29/08/2016 | Sanjay singh sarin and company 9336902909 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
258
| 734/VP/N/2016-17 | Circle 1 | P/L of interlocking and construction of barricading and retaining wall of RamLila Ashthal Chaukaghat. | 0.00 | 6.52 04/10/2016 | 18/11/2016 04/11/2016 | 03/12/2016 | 18/11/2016 04/11/2016 | Manoj kumar singh 9415284031 | SURESH KUMAR 7905982953 JE V.K GUPTA 7518102820 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
259
| 527/VP/N/2016-17 | Circle 1 | Patch repairing & BM SDC work in front of LIG/EWS at Lalpur Phase-I, Varanasi | 0.00 | 33.45 29/06/2016 | 29/08/2016 29/08/2016 | 28/10/2016 | 29/08/2016 29/08/2016 | Jwalamukhi Construction 9648999945 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE B.P MAURYA 9616464707 EX | Circle 1 | Completed |
260
| 24/VP/N/2017-18 | Circle 1 | Providing and fixing of Retro-Reflective sign board at different 4 place in collectrate campus, Varanasi | 0.00 | 0.87 07/03/2017 | 19/04/2017 18/04/2017 | 24/04/2017 | 19/04/2017 18/04/2017 | Vaisno Enterprises 8859794188 | B.N. SINGH 9451251318 JE V.K GUPTA 7518102820 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
261
| 218/VP/N/2016-17 | Circle 1 | P/F of floor tiles in guest room of Ayukt/Chairman Camp Office residence, Varanasi | 0.00 | 0.88 31/05/2016 | 24/06/2016 24/06/2016 | 09/07/2016 | 24/06/2016 24/06/2016 | Manoj kumar singh 9415284031 | SURESH KUMAR 7905982953 JE V.K GUPTA 7518102820 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
262
| 730/VP/N/2016-17 | Circle 1 | Construction of RCC Nala & Road Restoration work in North side of Lalpur Phase-II | 0.00 | 18.72 04/10/2016 | 02/11/2016 04/01/2016 | 03/01/2017 | 02/11/2016 04/01/2016 | Siddharth Construction 9415675937 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
263
| 763/VP/N/2016-17 | Circle 1 | P/L of rubber melded interlocking from PK Srivastava H.N. 4D to Manorma Devi H.N.4AC and Len No. 4C Dihababa mandir to Mahatam Singh House, at Sarnath Varanasi | 0.00 | 17.47 04/10/2016 | 19/11/2016 04/11/2016 | 03/01/2017 | 19/11/2016 04/11/2016 | Siddharth Construction 9415675937 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
264
| 800/VP/N/2016-17 | Circle 1 | Supply and fixing of CCTV Camera and 32'' TV in Commissioner Office Varanasi | 0.00 | 0.46 25/10/2016 | 24/11/2016 19/11/2016 | 26/11/2016 | 24/11/2016 19/11/2016 | | SURESH KUMAR 7905982953 JE M.N. ANSARI 7518102819 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
265
| 851/VP/N/2016-17 | Circle 1 | Construction of CC road from Harendra Singh building materials shop Chandmari Sindhaura road to Gyanwati Singh house. | 0.00 | 23.16 27/09/2016 | 04/11/2016 22/10/2016 | 21/12/2016 | 04/11/2016 22/10/2016 | Vikesh and Associates 9795200444 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
266
| 425/VP/N/2016-17 | Circle 1 | Repairing of Park in west side of EWS at Lalpur phase-II | 0.00 | 3.49 29/06/2016 | 06/08/2016 06/08/2016 | 05/09/2016 | 06/08/2016 06/08/2016 | Sita Traders 9838964640 | SURESH KUMAR 7905982953 JE OM PRAKASH GUPTA 0000000000 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
267
| 721/VP/N/2016-17 | Circle 1 | Raising of interlocking pavement around Park and construction of inner pathway in park at Bharat Milap Colony Nati Imli, Varanasi | 0.00 | 20.70 04/10/2016 | 29/11/2016 02/11/2016 | 20/03/2017 | 29/11/2016 02/11/2016 | Bhootnath Associats 9839110971 | B.N. SINGH 9451251318 JE OM PRAKASH GUPTA 0000000000 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
268
| 36/VP/N/2017-18 | Circle 1 | Repairing of water line at Lalpur Phase-II, Varanasi | 0.00 | 0.98 02/01/2017 | 28/04/2017 24/04/2017 | 30/04/2017 | 28/04/2017 24/04/2017 | Sanjiv Ranjan Srivastav 9336070099 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
269
| 799/VP/N/2016-17 | Circle 1 | Water pipe Line in West side of plot No. 1 Sector-D and in front of EWS in Sector-b at Lalpur Phase-I Varanasi | 0.00 | 0.79 25/10/2016 | 19/11/2016 19/11/2016 | 26/11/2016 | 19/11/2016 19/11/2016 | Singh Enterprises 9451893249 | SURESH KUMAR 7905982953 JE A.K SAXENA 9628372907 AE GOPAL KRISHN 75181028032 EX | Circle 1 | Completed |
270
| 459/VP/N/2019-20 | Circle 1 | Construction of CC Road at DLW to St. Johns Madauli, Varanasi | 0.00 | 82.29 05/08/2019 | 12/09/2019 01/09/2019 | 31/12/2019 | 12/09/2019 01/09/2019 | Akhilesh Associats 9628373523 | VIRENDRA KUMAR SINGH 9415576135 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
271
| 326/VP/N/2019-20 | Circle 1 | Painting work of Munshi Prem Chandra Statue, Gate, Smarak Asthal, Residence at Lamahai, Varanasi | 0.00 | 2.89 | 13/09/2019 17/07/2019 | 28/07/2019 | 13/09/2019 17/07/2019 | Vaisno Enterprises 8859794188 | PARAS NATH 7518102827 JE ANIL KUMAR DUBEY 7518102825 AE RAJ KUMAR 7518102812 EX | Circle 1 | Completed |
272
| 460/VP/N/2019-20 | Circle 1 | Extension of Meeting Hall at Commissioner office, Varanasi | 0.00 | 11.81 06/07/2019 | 12/09/2019 28/08/2019 | 27/11/2019 | 12/09/2019 28/08/2019 | Manoj kumar singh 9415284031 | AMAR NATH YADAV 7518102835 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
273
| 475/VP/N/2019-20 | Circle 1 | Bar code printing, pasting & RFID wet INLAY with HIGG3 chips etc work in VDA office, Varanasi. | 0.00 | 8.43 16/07/2019 | 13/09/2019 04/09/2019 | 03/03/2020 | 13/09/2019 04/09/2019 | Synergy Telimatrics Pvt. Ltd. | AMAR NATH YADAV 7518102835 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
274
| 476/VP/N/2019-20 | Circle 1 | Providing and fixing different type of materials for file management in VDA office, Varanasi. | 0.00 | 8.42 16/07/2019 | 13/09/2019 04/09/2019 | 03/03/2020 | 13/09/2019 04/09/2019 | Synergy Telimatrics Pvt. Ltd. | AMAR NATH YADAV 7518102835 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
275
| 547/VP/N/2019-20 | Circle 1 | Horticulture work at Padao Work, Varanasi. | 0.00 | 41.37 30/08/2019 | 24/09/2019 20/09/2019 | 19/01/2020 | 24/09/2019 20/09/2019 | D.K. Construction | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
276
| 512/VP/N/2019-20 | Circle 1 | Proposed estimate for Auditorium at office of S.P. Traffic Police Line, Varanasi. | 0.00 | 60.82 10/07/2019 | 13/09/2019 12/09/2019 | 11/12/2019 | 13/09/2019 12/09/2019 | Zahid Interiors | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
277
| 710/VP/N2016-17 | Circle 1 | Construction of RCC Colomn and grill work in Rani Pokhara at Shivpur, Varanasi. | 0.00 | 80.14 04/10/2016 | 02/11/2016 26/10/2016 | 25/01/2017 | 02/11/2016 26/10/2016 | Purvanchal Construction 9161884000 | PARAS NATH 7518102827 JE ANIL KUMAR DUBEY 7518102825 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
278
| 1037/VP/N/2018-19 | Circle 1 | Construction of gate on Varanasi- Gazipur main road via Markandey Mahadev, Kaithi Varanasi. | 0.00 | 50.35 24/12/2018 | 18/01/2019 14/01/2019 | 13/04/2019 | 18/01/2019 14/01/2019 | S.and S. Construction "9452235804 | PARAS NATH 7518102827 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
279
| 470/VP/N/2019-20 | Circle 1 | BM SDC and repairing of road in Brij Enclave Colony, Sundarpur, Varanasi. | 0.00 | 10.47 29/07/2019 | 05/10/2019 05/09/2019 | 04/10/2019 | 05/10/2019 05/09/2019 | Hind Associates 9415227155 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
280
| 573/VP/N/2019-20 | Circle 1 | Construction of K.C. Drain and road widening near BTS Campus at Laksha road Varanasi. | 0.00 | 21.28 16/08/2019 | 14/10/2019 28/09/2019 | 27/12/2019 | 14/10/2019 28/09/2019 | Hind Associates 9415227155 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
281
| 572/VP/N/2019-20 | Circle 1 | Maintenance of sewer, road, drain and disposal of malwa at Lalpur Phase-A and II | 0.00 | 4.18 20/08/2019 | 11/10/2019 21/09/2019 | 20/03/2020 | 11/10/2019 21/09/2019 | Kiyana Solution and services Pvt. Ltd. | PARAS NATH 7518102827 JE ANIL KUMAR DUBEY 7518102825 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
282
| 571/VP/N/2019-20 | Circle 1 | Maintenance work of Lalpur Housing Scheme, Landmark Tawar, Phase-II | 0.00 | 3.66 20/08/2019 | 11/10/2019 21/09/2019 | 20/03/2020 | 11/10/2019 21/09/2019 | Kiyana Solution and services Pvt. Ltd. | PARAS NATH 7518102827 JE ANIL KUMAR DUBEY 7518102825 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
283
| 650/VP/N/2018-19 | Circle 1 | Maintenance work of Lalpur Housing Scheme Landmark Tawar -II (House Keeping) | 0.00 | 3.56 20/09/2018 | 23/10/2018 01/10/2018 | 31/03/2019 | 23/10/2018 01/10/2018 | M/s Kiyana Solution and services Pvt. Ltd. | PARAS NATH 7518102827 JE ANIL KUMAR DUBEY 7518102825 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
284
| 649/VP/2019-20 | Circle 1 | Supply, installation & commissioning of 75 Kw on Grid Solar Power plant with solar panels on roof top of VDA office. | 0.00 | 41.25 02/09/2019 | 16/10/2019 16/10/2019 | 15/01/2020 | 16/10/2019 16/10/2019 | Premier Solar System Ptv. Ltd. 9935142188 | AMAR NATH YADAV 7518102835 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
285
| 988/VP/N/2018-19 | Circle 1 | BM SDC Work at internal road of Lalpur Scheme Phase-I Varanasi. | 0.00 | 89.04 17/12/2018 | 27/12/2018 25/12/2018 | 20/01/2019 | 27/12/2018 25/12/2018 | Siddharth Construction 9415675937 | PARAS NATH 7518102827 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
286
| 313/VP/N/2017-18 | Circle 1 | Construction of park in Ashok Nagar Colony Block No-A Sarnath Varanasi. | 0.00 | 23.36 28/06/2017 | 28/08/2017 01/08/2017 | 30/09/2017 | 28/08/2017 01/08/2017 | Bhootnath Associats 9839110971 | CHANDRA SHAKHAR PRASAD 7518102826 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
287
| 407/VP/N/2018-19 | Circle 1 | Construction of community hall and construction of boundary wall in front of India Section Thiyo Sofical Society, Varanasi. | 0.00 | 47.81 13/07/2018 | 31/07/2018 02/08/2018 | 03/02/2019 | 31/07/2018 02/08/2018 | Vaisno Enterprises 8859794188 | PAVAN GUPTA 7518102840 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
288
| 703/VP/N/2019-20 | Circle 1 | Maintenance of toilet at guest room, Nirman Anubhag, Asst. Property section room at VDA office. | 0.00 | 1.30 11/10/2019 | 24/10/2019 25/10/2019 | 10/11/2019 | 24/10/2019 25/10/2019 | Manoj kumar singh 9415284031 | AMAR NATH YADAV 7518102835 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
289
| 702/VP/N/2019-20 | Circle 1 | Maintenance of filtration plant of swimming pool at Sigara Stadium Varanasi. | 0.00 | 9.81 11/10/2019 | 24/10/2019 01/11/2019 | 30/12/2019 | 24/10/2019 01/11/2019 | Ajay Electronics 9454352628 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
290
| 651/VP/N/2019-20 | Circle 1 | Painting, Misc. repair and maintenance etc work for Gym Hall Dr. Sampurnanand Sports Stedium Sigara Vns. | 0.00 | 37.63 16/09/2019 | 24/10/2019 16/10/2019 | 15/02/2020 | 24/10/2019 16/10/2019 | Manoj kumar singh 9415284031 | VIRENDRA KUMAR SINGH 9415576135 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
291
| 732/VDA/N/2019-20 | Circle 1 | Dying & painting work of VDA office Varanasi. | 0.00 | 9.99 22/10/2019 | 06/11/2019 01/11/2019 | 01/12/2019 | 06/11/2019 01/11/2019 | Krishna Construction 9918598269 | AMAR NATH YADAV 7518102835 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
292
| 731/VP/N/2019-20 | Circle 1 | Painting/Chitrakari work in VDA office Vns. | 0.00 | 5.57 22/10/2019 | 06/11/2019 02/11/2019 | 01/12/2019 | 06/11/2019 02/11/2019 | Krishna Construction 9918598269 | AMAR NATH YADAV 7518102835 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
293
| 1180/VP/N/2018-19 | Circle 1 | Construction and beautification of pandey pokhara at Sarnath Varanasi. | 0.00 | 7.76 22/02/2019 | 06/03/2019 06/03/2019 | 05/04/2019 | 06/03/2019 06/03/2019 | Dev Enterprises 6454000083 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
294
| 223/VP/N/2019-20 | Circle 1 | Repairing of Toilet and exterior painting of building of commissinary office Varanasi. | 0.00 | 2.94 11/06/2019 | 26/06/2019 26/06/2019 | 11/07/2019 | 26/06/2019 26/06/2019 | Manoj kumar singh 9415284031 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
295
| 220/VP/N/2019-20 | Circle 1 | Repairing and slab work at Lalpur Phase-I and II Vns. | 0.00 | 2.05 11/06/2019 | 26/06/2019 26/06/2019 | 25/07/2019 | 26/06/2019 26/06/2019 | Sanjiv Ranjan Srivastav 9336070099 | PARAS NATH 7518102827 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
296
| 222/VP/N/2019-20 | Circle 1 | Laying sewer line at Lalpur Scheme Phase-I and II Vns | 0.00 | 6.95 11/06/2019 | 26/06/2019 26/06/2019 | 25/07/2019 | 26/06/2019 26/06/2019 | Sanjiv Ranjan Srivastav 9336070099 | PARAS NATH 7518102827 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
297
| 701/VP/N/2019-20 | Circle 1 | Supply and fixing of 16 nos. CC TV Camera in VDA office. | 0.00 | 1.57 11/10/2019 | 05/11/2019 25/10/2019 | 24/11/2019 | 05/11/2019 25/10/2019 | V-Tech Eectronic | AMAR NATH YADAV 7518102835 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
298
| 732/VP/N/2019-20 | Circle 1 | Painting work in VDA office Varanasi. | 0.00 | 9.99 22/10/2019 | 06/11/2019 02/11/2019 | 01/12/2019 | 06/11/2019 02/11/2019 | Krishna Construction 9918598269 | AMAR NATH YADAV 7518102835 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | In Progress |
299
| 841/VP/N/2016-17 | Circle 1 | Construction and beautification on Pandeypur Pokhara at Sarnath Vns. | 0.00 | 36.65 04/10/2016 | 03/01/2017 03/12/2016 | 02/02/2017 | 03/01/2017 03/12/2016 | Dev Enterprises 6454000083 | ATUL MISHRA 7518102839 JE ANIL KUMAR YADAV 9473618605 AE GIRISH CHAND SHARMA 7518102812 EX | Circle 1 | Completed |
300
| 809/VP/N/2019-20 | Circle 1 | Interios Work at Meeting/Conference Hall in Commissioner Office, Varanasi Scheme/Project Name | 0.00 | 0.00 13/11/2019 | 06/12/2019 28/11/2019 | 27/01/2019 | 06/12/2019 28/11/2019 | Zahid Interiors | AMAR NATH YADAV 7518102835 JE NARENDRA SINGH 7518102821 AE B.P MAURYA 9616464707 EX | Circle 1 | Not Started |